LIM SING PILING PTE LTD TRACK RECORD 1
|
|
|
PROJECT: |
PILE FOUNDATION FOR PROPOSED ERECTION OF A 2-STOREY SINGLE USER WAREHOUSE (FOR CAR SALE & DISPLAY WITHOUT WORKSHOP) & A BASEMENT ON LOT 4425 PT MK 24 AT UBI ROAD 4 |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$217,941.82 |
TYPE OF JOB: |
R.C & STEEL SHEET PILING |
Completion: |
Apr-95 |
|
|
ARCHITECTS |
TAY KHENG GUAN ARCHITECTS |
ENGINEERS |
CERICON CONSULTANTS |
OWNER: |
ALJUNIED AUTO AMALGAMATED PTE LTD |
————–
|
|
PROJECT: |
PROPOSED CONVENTION HOUSING DEVELOPMENT COMPRISING 421 UNITS 3-STOREY TERRACE HOUSE, 2 SUB-STATION, 2 TRANSFORMER STATION, 1 TELECOM STATION ON LOT 1163 MK 31 AT LOYANG AVE/TAMPINES ROAD FOR LOYANG VILLAR |
|
|
|
|
MAIN CONTR: |
CHING SOON CONST. PTE LTD |
Contract Sum: |
$776,544.55 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Apr-95 |
|
|
ARCHITECTS |
DESIGN LINK ARCHITECTS |
ENGINEERS |
DE CONSULTANTS PTE LTD |
OWNER: |
FIRST LOYANG LAND PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF 2 BLOCK OF SUB-STATION AT EAST COAST PARK |
|
|
MAIN CONTR: |
CKT THOMAS PTE LTD |
Contract Sum: |
$558,008.30 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jun-95 |
|
|
|
|
ARCHITECTS |
PSA |
ENGINEERS |
PSA |
OWNER: |
PSA |
————– |
|
PROJECT: |
PROPOSED 2 BLOCK OF 3-STOREY FACTORY CUM ANCILLARIES ON LOT 2795 PT MK 6 PENG KANG AT UPPER JURONG ROAD |
|
|
|
|
|
MAIN CONTR: |
LEE SERVICE CONST. PTE LTD |
Contract Sum: |
$564,628.04 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Aug-95 |
|
|
ARCHITECTS |
CO-DESIGN ARCHITECTS |
ENGINEERS |
CS ENGINEERING SERVICE |
OWNER: |
GLIDEROL DOOR (S) PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED ST. ANDREW JUNIOR SCHOOL AT FRANCIS THOMAS DRIVE |
|
|
MAIN CONTR: |
CKT THOMAS PTE LTD |
Contract Sum: |
$553,003.70 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Oct-95 |
|
|
ARCHITECTS |
HO KWONG YEW & SON ARCHITECTS |
ENGINEERS |
SLP CONSULTING ENGINEERS |
OWNER: |
ST. ANDREW’S JUNIOR SCHOOL |
————– |
|
PROJECT: |
PILES FOUNDATIONS FOR PROPOSED ERECTION OF PART 4/PART 5-STOREY SINGLE USER FACTORY ON PLOT A14097 MK 11 AT SUNGEI KADUT LOOP |
|
|
|
MAIN CONTR: |
SIN TAT LEE CONST. PTE LTD |
Contract Sum: |
$374,132.04 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Dec-95 |
|
|
|
|
ARCHITECTS |
|
ENGINEERS |
EDP ENGRG. DESIGN PARTNERSHIP |
OWNER: |
CHEN HOCK HENG TEXTILE PRINTING PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 2
|
|
|
PROJECT: |
PILES FOUNDATIONS FOR PROPOSED ERECTION OF PART 3/PART 6-STOREY INDUSTRIAL BUILDING ON LOTS 1692PT & 1737PT MK 11 AT SUNGEI KADUT LOOP |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$1,479,860.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jan-96 |
|
|
ARCHITECTS |
TAY KHENG GUAN ARCHITECT |
ENGINEERS |
KINHILL TAN PTE LTD |
OWNER: |
LEEFON CORPORATION PTE LTD |
————– |
|
PROJECT: |
PILE FOUNDATION FOR PROPOSED ERECTION OF A 4-STOREY WITH A BASEMENT SINGLE USER SINGLE OCCUPIERE WAREHOUSE (CAR SHOWROOM WITHOUT WORKSHOP FACILITY LOT 4425 PT-1 MK 23 AT UBI RD 4 (HDB PERCEL 10) |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$305,602.00 |
TYPE OF JOB: |
R.C & STEEL SHEET PILING |
Completion: |
Jan-96 |
|
|
ARCHITECTS |
TAY KHENG GUAN ARCHITECTS |
ENGINEERS |
CERICON CONSULTANTS |
OWNER: |
UBI NEW & USED CAR CENTRE PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF 9 UNITS OF 3-STOREY TOWN HOUSES WITH BASEMENT CARPARK ON LOTS 50-83 & 1362 MK 26 AT CEYLON ROAD |
|
|
|
MAIN CONTR: |
BLUE STAR GENERAL CONTRACTOR |
Contract Sum: |
$300,000.00 |
TYPE OF JOB: |
R.C PILING & STELL SHEET PILE |
Completion: |
Feb-96 |
|
|
ARCHITECTS |
ARCHITERIA |
ENGINEERS |
E 3 CONSULTING ENGINEERS |
OWNER: |
SSM INVESTMENT PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF A 3-STOREY FOOD CENTRE WITH A BASEMENT ON URA LAND PARCEL 464 LOTS 370 AT TELOK AYER STREET |
|
|
|
|
|
MAIN CONTR: |
JIAN MAN CONST. PTE LTD |
Contract Sum: |
$590,042.81 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Mar-96 |
|
|
ARCHITECTS |
DESIGNPOINT ARCHITECTS |
ENGINEERS |
KTP CONSULTANTS |
OWNER: |
CHINA SQUARE FOOD CENTRE PTE LTD |
————– |
|
PROJECT: |
PROPOSED FACTORY DEVELOPMENT COMPRISING 2 BLOCK OF 2-STOREY FACTORY WITHMEZZANINE FLOOR ON PLOT A15544 MK 6 AT PENJURU ROAD |
|
|
|
MAIN CONTR: |
MERIT ENGINEERING PTE LTD |
Contract Sum: |
$301,039.65 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Mar-96 |
|
|
ARCHITECTS |
TRANSURBAN ASSOCIATES |
ENGINEERS |
PROTEAM CONSULTING ENGINEERS |
OWNER: |
AMP CONSYERTERS PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED 4-STOREY FACTORY WITH ANCILLARY OFFICE ON LOT 4715 PT MK 23 AT UBI ROAD 4 |
|
|
|
MAIN CONTR: |
N S TANG PTE LTD |
Contract Sum: |
$430,111.88 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Apr-96 |
|
|
ARCHITECTS |
A C PARTNERSHIP |
ENGINEERS |
K L THAM ENGRG CONSULTANTS |
OWNER: |
WANGI INDUSTRIAL PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 3
|
|
|
PROJECT: |
PROPOSED CONVENTIONAL HOUSING DEVELOPMENT COMPRISING OF 50 PAIR OF 3-STOREY SEMI-DETACHED DWELLING HOUSE, 239 UNITS OF 3-STOREY TERRACE DWELLING HOUSE, 3 SUB-STATION, SINGLE STOREY MDF BLDG ON LOTS 230 PT MK 9 AT JALAN BAHAR |
|
|
|
|
|
MAIN CONTR: |
CHING SOON CONST. PTE LTD |
Contract Sum: |
$1,420,451.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
May-96 |
|
|
ARCHITECTS |
ADDP ARCHITECTS |
ENGINEERS |
DE CONSULTANTS PTE |
OWNER: |
FIRST JURONG LAND PTE LTD |
————– |
|
PROJECT: |
PROPOSED R.C PILING FOR MOBIL SERVICE STATION AT CHOA CHU KANG WAY |
|
|
MAIN CONTR: |
LEE SERVICE CONST. PTE LTD |
Contract Sum: |
$300,671.31 |
TYPE OF JOB: |
R.C PILING |
Completion: |
May-96 |
|
|
ARCHITECTS |
JAMES FERRIE & PARTNERS |
ENGINEERS |
ENGINEERING ASSOCIATES |
OWNER: |
MOBIL OIL (S) PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY FACTORY CUM ANCILLARIES ON PLOT A14253 ON GOVT. SURVEY LOT 234 PT MK 5 PENG KANG AT PENJURU ROAD |
|
|
|
MAIN CONTR: |
LEE SERVICE CONST. PTE LTD |
Contract Sum: |
$345,833.92 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jul-96 |
|
|
ARCHITECTS |
CO-DESIGN ARCHITECTS |
ENGINEERS |
LSW CONSULTING ENGINEERS |
OWNER: |
WILLIAMS PRECISION ENGINEERING PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF A PART 2/PART 4-STOREY FACTORY WITH ANCILLARY OFFICE ON LOT 255 PT (PLOT A15932) MK 6 PENG KANG AT CHIA PING ROAD |
|
|
|
MAIN CONTR: |
LIM KEENLY BUILDERS (PTE) LTD |
Contract Sum: |
$240,180.06 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Aug-96 |
|
|
ARCHITECTS |
LIM ENG KHOON ARCHITECTS |
ENGINEERS |
PROTEAM CONSULTING ENGINEERS |
OWNER: |
TAT LEE ENGINEERING PTE LTD |
————– |
|
|
|
PROJECT: |
CONSTRUCT OF RAIL CLEARANCE FACILITIER AT WOODLANDS |
|
|
MAIN CONTR: |
LIAN HOCK HUAT CONST. PTE LTD |
Contract Sum: |
$638,310.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Sep-96 |
|
|
ARCHITECTS |
PWD |
ENGINEERS |
PWD |
OWNER: |
PWD |
————– |
|
PROJECT: |
PILED FOUNDATIONS FOR PROPOSED ERECTION OF A BLK OF 5-STOREY FACTORY BUILDING WITH ANCILLARY SHOWROOM AT 1ST STY & ANCILLARY OFFICE ON LOT 4420 PT (PLOT 4) AT UBI RD 3 |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$402,400.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Oct-96 |
|
|
ARCHITECTS |
PAN-INDO ARCHITECTS INTERNATIONAL |
ENGINEERS |
KKT CONSULTANTS |
OWNER: |
WELLFORM CONST. PTE LTD/MINTWELL INDUSTRY PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 4
|
|
|
PROJECT: |
PROPOSED ERECTION OF A PART 2/PART 6-STOREY WAREHOUSE CUM ANCILLARY OFFICE DEVELOPMENT ON LOT 7880 PT PLOT A14743 (JTC ESTATE) BEDOK MK 27 AT THE JUNCTION OF CHANGI SOUTH AVE 3 AND XLIN AVE |
|
|
|
|
MAIN CONTR: |
RUBY PILING & CONST. PTE LTD |
Contract Sum: |
$645,757.50 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Oct-96 |
|
|
ARCHITECTS |
NIKKEN SEKKEI PARTNERSHIP |
ENGINEERS |
HAINAL-KONYI CONSULTING ENGINEERS |
OWNER: |
RHEMA CENTRE PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF A-5-STOREY FLATTED FACTORY WITH BASEMENT CAR PARK ON LOTS 2050 & 1278 MK 23 AT LIM TECK BOON ROAD |
|
|
|
MAIN CONTR: |
BLUE STAR CONST. PTE LTD |
Contract Sum: |
$335,300.00 |
TYPE OF JOB: |
DEMOLITION & R.C PILING WORKS |
Completion: |
Oct-96 |
|
|
ARCHITECTS |
JLA ARCHITECTS |
ENGINEERS |
NEXG GROUP DESIGN |
OWNER: |
NANYANG ENVELOPE MFG. PTE LTD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF A PART 2/3-STOREY FACTORY BUILDING WITH ANCILLARY OFFICE ON LOT 4572 PT MK 5 AT PENJURU ROAD |
|
|
|
MAIN CONTR: |
LEE SERVICE CONST. PTE LTD |
Contract Sum: |
$458,924.95 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Nov-96 |
|
|
ARCHITECTS |
CO-DESIGN ARCHITECTS |
ENGINEERS |
LSW CONSULTANTS |
OWNER: |
XIN XIN PACKAGING PTE LTD |
————– |
|
PROJECT: |
PILING WORKS TO PROPOSED NEW ERECTION OF 3-STOREY FACTORY ON LOT 1737 PT & 1692 PT MK 11 AT SUNGEI KADUT LOOP |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$376,222.70 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Mar-97 |
|
|
ARCHITECTS |
FUJINAMI ARCHITECTS & ASSOCIATES |
ENGINEERS |
TP SEOW CONSULTANTS |
OWNER: |
MELANDS CASA MOBILI PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED BORED PILING WORKS TO PROPOSED ERECTION OF 4-STOREY FACTORY WITH BASEMENT CARPARK ON PLOT A16250 (LOTS 497 PT) MK 6 AT JURONG PORT RD |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$560,000.00 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Apr-97 |
|
|
ARCHITECTS |
WP ARCHITECTS |
ENGINEERS |
ENGINEER 93 |
OWNER: |
KING WAN CONSTRUCTION PTE LTD |
————– |
|
|
|
PROJECT: |
BORED PILING & R.C PILING WORKS TO CONTIGUOUS BORED PILE WALL WITH CAPPING BEAM AND RC RETAINING WALL FOR PROPOSED ERECTION OF 9-STOREY BLOCK OF FLATS (COMPRISING 16 APARTMENT UNITS) ON LOT 73-1 TS 19 AT 67 SOPHIA ROAD |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$488,700.47 |
TYPE OF JOB: |
R.C PILING, BORED PILING & RETAINING WALL |
Completion: |
May-97 |
|
|
ARCHITECTS |
DESIGN GROUP INCORPORATES ARCHITECTS |
ENGINEERS |
C & V CONSULTANTS |
OWNER: |
ESTATES OF HIRA SINGH |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 5
|
|
|
PROJECT: |
PROPOSED ERECTION OF CHURCH ON LOT 1792 PT MK 19 AT YISHUN STREET 11 FOR SMYRNA ASSEMBLY OF GOD |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$164,335.47 |
TYPE OF JOB: |
R.C PILING |
Completion: |
May-97 |
|
|
ARCHITECTS |
CYRIL K. H. SEAH ARCHITECTS |
ENGINEERS |
OSCAR FABER CONSULTANTS |
OWNER: |
SMYRNA ASSEMBLY OF GOD |
————– |
|
PROJECT: |
PROPOSED ERECTION OF 6-STOREY FACTORY ON PLOT A15983 LOT 12321PT MK 18 AT SERANGOON NORTH AVE 4 |
|
|
|
MAIN CONTR: |
LEND LEASE/V3 CONST. PTE LTD |
Contract Sum: |
$230,325.05 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jun-97 |
|
|
ENGINEERS |
MEINHARDT (SINGAPORE) PTE LTD |
OWNER: |
ADVANCED SYSTEMS AUTOMATION LTD |
————– |
|
PROJECT: |
PILING WORKS TO PROPOSED 18-STOREY RESIDENTIAL BUILDING (TOTAL: 32 UNITS) WITH SWIMMING POOL & 1ST STOREY CARPARK ON LOT 4299 MK 25 AT TANJONG RHU/FORT ROAD |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$385,564.61 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jul-97 |
|
|
ARCHITECTS |
TANGGUANBEE ARCHITECTS |
ENGINEERS |
P & T CONSULTANTS |
OWNER: |
T3 INVESTMENT PTE LTD |
————– |
PROPOSED ERECTION OF 6-STOREY WORKER’S DORMITORY HOUSING WITH A 2-STOREY ANCILLARY BUILDING ON LOT 1-24 PT MK 29 AT TAMPINES AVE 10 |
PROJECT: |
|
|
|
|
MAIN CONTR: |
SEMBAWANG ENGRG. AND CONST. PTE LTD |
Contract Sum: |
$718,708.42 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Aug-97 |
|
|
|
|
ARCHITECTS |
HEAH HOCK HENG & PARTNERS |
|
|
ENGINEERS |
CHONG & LEE CONSULTANTS |
|
|
OWNER: |
JURONG TOWN CORPORATION |
————– |
|
|
|
PROJECT: |
DESIGN, SUPPLY & INSTALLATION OF CAST IN PLACE BORED PILES AND DESIGN PILE CAPS ONLY TO THE PROPOSED IND. PARK DEVELOPMENT ON LOT 4813 PT & 912 PT MK 23 AND 4362PT, 4977PT 553PT, 2551PT, 4255PT, 4357PT AND STATE RESERVE (PT) MK 28 AT KAKI BUKIT AVE 1 |
|
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$3,393,701.68 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Sep-97 |
|
|
ARCHITECTS |
DESIGN LINK ARCHITECTS |
ENGINEERS |
RONNIE & KOH PARTNERSHIP |
OWNER: |
SIN SOON LEE IND. PARK PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED BORED PILING WORKS FOR PROPOSED 6-STOREY WAREHOUSE DEVELOPMENT ON LOT 7878L (PLOT A15869) MK 27 CHANGI SOUTH STEET 3 |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$1,512,128.35 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Oct-97 |
|
|
ARCHITECTS |
WEE LENG HUAT |
ENGINEERS |
CH & ASSOCIATES CONSULTING ENGINEERS |
OWNER: |
AMP SINGAPORE PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 6
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE STOREY BUS INTERCHANGE ON LOT 1750 (SL) PT MK 7 AT TUAS WEST DR/JALAN AHMAD IBRAHIM |
|
|
|
MAIN CONTR: |
SIN TAI LEE CONST. PTE LTD |
Contract Sum: |
$510,301.94 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Nov-97 |
|
|
ARCHITECTS |
ANG KHENG LENG & ASSOCIATES |
ENGINEERS |
LTL ENGINEERING CONSULTANTS |
OWNER: |
LAND TRANSPORT AUTHORITY OF SINGAPORE |
————– |
|
PROJECT: |
PROPOSED ERECTION OF PART 7-STOREY SINGLE USER SINGLE OCCUPIER FACTORY BLDG. WITH A PART SINGLE STOREY ANCILLARY AUTOMATED WAREHOUSE ON LOT 2400WPT MK 7 AT TUAS AVE 10 |
|
|
|
|
MAIN CONTR: |
WEI SIN CONST. PTE LTD |
Contract Sum: |
$376,699.85 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Nov-97 |
|
|
ARCHITECTS |
JTC INTERNATIONAL PTE LTD |
ENGINEERS |
JTC INTERNATIONAL PTE LTD |
OWNER: |
FREIGHT LINKS EXPRESS HOLDINGS LTD |
————– |
|
|
|
PROJECT: |
PROPOSED PILING WORKS TO PROPOSED ERECTION OF PART 4-STOREY SINGLE USER, SINGLE-OCCUPIER WAREHOUSE ON LOTS 339PT, 340, 341, 342, 343, 348PT, 349, 350, 351, 352PT 362PT, 430PT, 5989PT, 5900 MK 27 AT CHANGI SOUTH LANE |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$2,820,907.20 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Jan-98 |
|
|
ARCHITECTS |
ARCHITECTS VISTA |
ENGINEERS |
KINHILL SINGAPORE |
OWNER: |
KIAN ANN WAREHOUSING PTE LTD |
————– |
|
|
|
PROJECT: |
BORED PILING FOR PROPOSED EXTENSION OF A BLOCK OF 4-STOREY FACTORY & A & a TO A BLOCK OF EXISTING SINGLE SINGLE STOREY FACTORY WITH 3-STOREY ANCILLARY OFFICE ON LOT 1644 PT (PLOT A12482) MK 11 AT SUNGEI KADUT WAY FOR M/S KAI SIONG TRADING (S) PTE TD |
|
|
|
|
|
MAIN CONTR: |
HUA CHEW CONST. PTE LTD |
Contract Sum: |
$335,024.77 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Jan-98 |
|
|
ARCHITECTS |
HK HIA & ASSOCIATES |
ENGINEERS |
PARTNERSHIP CONSULTANTS |
OWNER: |
KAI SIONG TRADING (S) PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED ADDITIONS & ALTERATION TO EXISTING GAYLANG METHODIST SECONDARY SCHOOL ON LOT 6281 MK 24 AT ALJUNIED RD/GEYLANG EAST CENTRAL |
|
|
|
MAIN CONTR: |
NGEE LIAN BUILDERS PTE LTD |
Contract Sum: |
$262,937.11 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jan-98 |
|
|
ARCHITECTS |
TAN EE PING |
ENGINEERS |
PARTNERSHIP CONSULTANTS |
OWNER: |
GAYLANG METHODIST SEC. SCHOOL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 7
|
|
|
PROJECT: |
BORED PILING FOR PROPOSED AMENDMENT TO APPROVED SINGLE STOREY FACTORY WITH A 3-STOREY ANCILLARY OFFICE ON LOT 1820 (PLOT 15021) MK 11 KRANJI AT SUNGEI KADUT WAY (PHASW 2) |
|
|
|
|
MAIN CONTR: |
HUA GAN PTE LTD |
Contract Sum: |
$326,594.82 |
TYPE OF JOB: |
BORED PILING |
Completion: |
Jun-98 |
|
|
ARCHITECTS |
HK HIA & ASSOCIATES |
ENGINEERS |
PARTNERSHIP CONSULTANTS |
OWNER: |
HUA KOK REALTY (PTE) LTD |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 5-STOREY, SINGLE USER SINGLE OCCUPIER FACTORY WITH ANCILIARY FACILTIES ON LOT 3156T, PLOT A17199, MK 13 AT WOODLANDS LOOP |
|
|
|
MAIN CONTR: |
SIN TAI LEE CONST. PTE LTD |
Contract Sum: |
$863,543.10 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Jun-98 |
|
|
ARCHITECTS |
AC PARTNERSHIP |
ENGINEERS |
TC SIN & ASSOCIATES |
OWNER: |
METALFORM PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED RELOCATION OF HIAG GIRLS SCHOOL SCHOOL COMPRISING OF THREE 2-STOREY BLOCK, TWO 3-STOREY BLOCK & ONE 4-STOREY BLOCK AT KOON SENG ROAD |
|
|
|
MAIN CONTR: |
TOH SENG SIT CONST. PTE LTD |
Contract Sum: |
$1,504,626.10 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Mar-99 |
|
|
ARCHITECTS |
|
ENGINEERS |
MM ENGINEERING CONSULTANTS |
OWNER: |
HAIG GIRLS’ SCHOOL |
|
|
PROJECT: |
PROPOSED REDEVELOPMENT OF ST. MARGARET’S SECONDARY SCHOOL ON LOT 343, 123-1, 407 & 410, 1031 (PART) MK 2 AT 111 FARRER ROAD |
|
|
|
MAIN CONTR: |
LIAN HOCK HUAT CONST. PTE LTD |
Contract Sum: |
$802,220.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Mar-99 |
|
|
ARCHITECTS |
ARCHITECTS 1990 |
ENGINEERS |
DE CONSULTANTS (S) PTE LTD |
OWNER: |
INFANT JESUS BOARD OF MANAGEMENT C/O CATHOLIC JUNIOR COLLEGE |
————– |
|
PROJECT: |
PROPOSED ERECTION OF 6-STOREY PRIMARY SCHOOL DEVELOPMENT WITH SUB-STATION, BIN CENTRE & CARPARKS ON LOTS 6833, 6835, 7662 MK 22 AT UPPER SERANGOON ROAD FOR M/S CHIJ POGGOL |
|
|
|
|
MAIN CONTR: |
LIAN HOCK HUAT CONST. PTE LTD |
Contract Sum: |
$415,300.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
May-99 |
|
|
ARCHITECTS |
S.G. CHIN & ASSOCIATES |
ENGINEERS |
LOH CONSULTANTS PTE LTD |
OWNER: |
INFANT JESUS BOARD OF MANAGEMENT C/O CATHOLIC JUNIOR COLLEGE |
————– |
|
PROJECT: |
(CONTRACT 3434) REDESTRIAN OVERHEAD ACROSS TPE NEAR BLOCK 124 PASIR RIS ST 11 |
|
|
|
MAIN CONTR: |
JACKSON SUPPLIES PTE LTD |
Contract Sum: |
$110,743.43 |
TYPE OF JOB: |
STEEL H-PILING |
Completion: |
May-99 |
|
|
ARCHITECTS |
LTA |
ENGINEERS |
LTA |
OWNER: |
LTA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 8
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2-STOREY & 3-STOREY BUILDERS AND A & A TO THE EXISTING SIGLAP SOUTH CC ON LOT 3024 MK 27 AT NO. 6 PALM ROAD |
|
|
|
MAIN CONTR: |
SYNERGY CONST. PTE LTD |
Contract Sum: |
$108,522.70 |
TYPE OF JOB: |
R.C PILING WORKS |
Completion: |
Aug-99 |
|
|
ARCHITECTS |
ARCHITESTS STUDIO |
ENGINEERS |
THAM & WONG |
OWNER: |
PEOPLE ASSOCIATION |
————– |
|
|
|
PROJECT: |
PROPOSED SINGLE USER/SINGLE OCCUPIER FACTORY COMPRISING ONE BLK OF 3-STOREY ANCILLARY OFFICE, ONE BLK OF CO2 PLANT, ONE BLK OF C2H2 MAINFOLD, FENERATOR/PURIFIER ROOM ON LOT 2678X PT PLOT A18026 MK 7 AT TUAS VIEW LANE |
|
|
|
|
MAIN CONTR: |
MERITA ENGRG PTE LTD |
Contract Sum: |
$361,946.12 |
TYPE OF JOB: |
R.C PILING WORKS |
Completion: |
Aug-99 |
|
|
ARCHITECTS |
TRANSURBAN ASSOCIATES |
ENGINEERS |
CS CONSULTING ENGINEERS |
OWNER: |
CHEM GAS PTE LTD |
————– |
|
|
|
PROJECT: |
R.C PILING WORKS FOR LTA PROJECT: KALLANG BAHRU TO BEDOK FLYOVER (P I E) |
|
|
|
MAIN CONTR: |
WEE POH CONST. PTE LTD/W & P PILING PTE LTD |
Contract Sum: |
$2,047,438.86 |
TYPE OF JOB: |
R.C PILING WORKS |
Completion: |
Aug-99 |
|
|
ARCHITECTS |
LTA |
ENGINEERS |
LTA |
OWNER: |
LTA |
————– |
|
|
|
PROJECT: |
PROPOSED R.C PILING WORKS FOR PROPOSED PART 3-STOREY & PART 4-STOREY ITE MACPHERSON ON LOT NOS. 3282PT, 4797PT, 4799PT, 4803PT, 4815PT 5352PT 5360PT, 7170PT MK 24 AT 300 CIRCUIT ROAD |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$934,549.00 |
TYPE OF JOB: |
R.C PILING |
Completion: |
Oct-99 |
|
|
ARCHITECTS |
DESIGN METABOLISTS |
ENGINEERS |
KTP CONSULTANTS PTE LTD |
OWNER: |
INSTITUTE OF TECHNICAL EDUCATION |
————– |
|
PROJECT: |
PROPOSED PILING WORKS FOR PROPOSED A BLOCK OF 5-STOREY YEW TEE COMMUNITY CLUB AT CHOA CHU KANG ST. 52 |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$440,896.00 |
TYPE OF JOB: |
R.C PILING WORKS |
Completion: |
Oct-99 |
|
|
ARCHITECTS |
RSP ARCHITECTS PLANNERS & ENGINEERS (PTE) LTD |
ENGINEERS |
RSP ARCHITECTS PLANNERS & ENGINEERS (PTE) LTD |
OWNER: |
PEOPLE ASSOCIATION |
————– |
|
|
|
PROJECT: |
PROPOSED FOWLIE PRIMARY SCHOOL COMPRISING OF 5-BLK OF 4-STOREY & 1 BLK OF 3-STOREY & OTHER ANCILLARY BUILDING ON LOT 2165 MK 25 AT HAIG ROAD |
|
|
PROPOSED ERECTION OF PRIMARY SCHOOL SCHOOL AT JURONG WEST SITE 21 PWD(CIVIL)EL 2128/98 |
|
|
MAIN CONTR: |
SAL Const. Pte Ltd |
Contract Sum: |
$1,289,775.11 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Oct-99 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 9
|
|
|
PROJECT: |
PROPOSED ERECTION OF 1 BLOCK OF 4-STOREY FLATED FACTORY (GENERAL INDUSTRY) WITH CANTEEN, 22/6.6 KV SUB-STATION & A BASEMENT CAR PARK AT CHANGI NORTH STREET 1 LOT NO 2826 MPT MK 31 CHANGI NORTH |
|
|
|
|
MAIN CONTR: |
SAL Const. Pte Ltd |
Contract Sum: |
$533,176.95 |
TYPE OF JOB: |
Bored Piling & R.C Piling Works |
Completion: |
Oct-99 |
|
|
ARCHITECTS |
JTC |
ENGINEERS |
JTC |
OWNER: |
JTC |
————– |
|
|
|
PROJECT: |
R.C PILING WORKS FOR PROPOSED EXTENSION COMPRISING OF A 4-STOREY CLASSROOM BLOCK, 3-STOREY CONCERT THEATRE (800 SEATS) & LECTURE THEATRE AT BASEMENT AND A & A TO THE EXISTING VICTORIA JUNIOR COLLEGE ON LOT 8250 PTE MK 27 AT NO. 20 MARINE VISTA |
|
|
|
|
|
MAIN CONTR: |
SAL Const. Pte Ltd |
Contract Sum: |
$214,220.17 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Mar-00 |
|
|
ARCHITECTS |
Alfred Wong Partnership Pte Ltd |
ENGINEERS |
Meinhardt (S) Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
PROJECT: |
PROPOSED NEW ERECTION OF PART 1/PART 4-STOREY SINGLE USER/SINGLE OCCUPIER FACTORY ON PLOT A18774 AT TUAS SOUTH AVE 5 FOR M/S UNITED PAPER INDUSTRIAL PTE LTD |
|
|
|
|
MAIN CONTR: |
Merita Builders Pte Ltd |
Contract Sum: |
$745,540.00 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Mar-00 |
|
|
ARCHITECTS |
Transurban Associates |
ENGINEERS |
HSK & Associates |
OWNER: |
United Paper Industrial Pte Ltd |
————– |
|
PROJECT: |
PROPOSED ERECTION OF 5-STOREY FACTORY WITH ANCILLARY OFFICE ON LOT 2692A PLOT A19262 MK 7 AT TUAS SOUTH STREET 5 |
|
|
|
|
|
MAIN CONTR: |
Guan Tong Const. Co (Pte) Ltd |
Contract Sum: |
$376,556.07 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Mar-00 |
|
|
|
|
ARCHITECTS |
RG Architects |
|
|
ENGINEERS |
T.H. Chuah & Partners |
OWNER: |
Singapore Daito Engrg Pte Ltd |
————– |
|
|
|
PROJECT: |
DESIGN OF PILE CAP & BORED PILING WORKS FOR PROPOSED ERECTION OF 4-STOREY NEIGHBOURHOO POLICE CENTRE ON LOT(S) 7241 PT MK 27 AT CHAI CHEE DRIVE/LOT(S) 6048 PT MK 28 AT TAMPINES ST 91 |
|
|
|
|
MAIN CONTR: |
ZESTBUILD PTE LTD |
Contract Sum: |
$150,505.00 |
TYPE OF JOB: |
Design of Pile & Pile-Cap, RC & Bored Pling Works |
Completion: |
Mar-00 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Singapore Police Force |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 10
|
|
|
PROJECT: |
DESIGN OF PILE CAP & R.C PILE FOR PROPOSED ERECTION OF 4-STOREY NEIGHBOURHOO POLICE CENTRE ON LOT 11729 (PT) MK 18 AT ANG MO KIO AVE 3/LOT 1643 (PT) MK 19 AT YISHAN CENTRAL/LOT 6513(PT) MK 22 AT HOUGANG AVE 4 |
|
|
|
|
MAIN CONTR: |
Kian Hiap Const. Pte Ltd |
Contract Sum: |
$376,556.07 |
TYPE OF JOB: |
Design of Pile & Pile-Cap, R.C Piling Works |
Completion: |
Mar-00 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Singapore Police Force |
————– |
|
|
|
PROJECT: |
DESIGN OF PILE CAP & BORED PILING WORKS FOR PROPOSED ERECTION OF 4-STOREY NEIGHBOURHOO POLICE CENTRE AT YISHUN ST 81 & SEMBAWANG DRIVE |
|
|
|
MAIN CONTR: |
Synergy Const. Pte Ltd |
Contract Sum: |
$376,556.07 |
TYPE OF JOB: |
Design of Pile & Pile-Cap, Bored Pling Works |
Completion: |
Mar-00 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Singapore Police Force |
————– |
|
|
|
PROJECT: |
PROPOSED R.C PILING WORKS FOR PROPOSED 7-STOREY LIGHT INDUSTRIAL DEVELOPMENT (PLOT B FLATTED FACTORY) ON LOT 4429 PT MK 23 AT KAKI BUKIT ROAD 3 (URA LAND PARCEL 380) (BEDOK PLANNING AREA) |
|
|
|
|
MAIN CONTR: |
W & P Piling Pte Ltd |
Contract Sum: |
$423,163.39 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Apr-00 |
|
|
ARCHITECTS |
Strategic Design International |
ENGINEERS |
Mtech Consultants |
OWNER: |
Tavica Design Pte Ltd |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 3-STOREY FACTORY WITH ANCILLARY OFFICE ON LOT 530 PT PLOT A5927 MK 11 AT NO. 29 SUNGEI KADUT ST 6 |
|
|
|
MAIN CONTR: |
SIN TAI LEE CONST PTE LTD |
Contract Sum: |
$127,740.29 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
May-00 |
|
|
ARCHITECTS |
Kian Loh & Associates |
ENGINEERS |
Kian Loh & Associates |
OWNER: |
HON NAM LEE |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY RESIDENTIAL ON LOT 7781L (SL) MK 24 (URA LAND PARCEL B) AT LORONG LEW LIAN |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$336,196.20 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Jun-00 |
|
|
ARCHITECTS |
JAMES YIP & PARTNERS |
ENGINEERS |
C P LIM & PARTNERS |
OWNER: |
ONG LYE DEVELOPMENT PTE LTD |
————– |
|
PROJECT: |
PROPOSED PILING WORKS FOR PROPOSED ERECTION OF A 8-STOREY FLAT DEVELOPMENT (TOTAL 14 UNITS) ON LOT 3025 MK 24 AT LORONG 31 GEYLANG |
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$89,716.09 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Jun-00 |
|
|
ARCHITECTS |
JAMES YIP & PARTNERS |
ENGINEERS |
LJ & PARTNERS |
OWNER: |
PEOPLE’S CONSTRUCTION PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 11
|
|
|
PROJECT: |
PROPOSED BORED PILING WORKS FOR PROPOSED ERECTION OF 4-STOREY FACTORY CUM ANCILLARY OFFICE WITH BASEMENT ON PLOT A19832 MK 31 AT LOYANG CRESCENT |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$497,143.02 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Jun-00 |
|
|
ARCHITECTS |
ACEPAC ENGINEERING CONSULTANTS |
ENGINEERS |
ACEPAC ENGINEERING CONSULTANTS |
OWNER: |
KENYON ENGINEERING PTE LTD |
————– |
|
|
|
PROJECT: |
SUPPLY & INSTALLATION OF BORED PILE FOR PROPOSED EXPANSION OF THE VIP COMPLEX AT TERMINAL 2 |
|
|
|
MAIN CONTR: |
SAL CONST. PTE LTD |
Contract Sum: |
$407,823.71 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Jul-01 |
|
|
ARCHITECTS |
PWD |
ENGINEERS |
PWD |
OWNER: |
PWD |
————– |
|
|
|
PROJECT: |
PILING WORKS FOR PROPOSED ADDITIONS AND ALTERATIONS TO THE APPROVED EXISTING 2-STOREY SINGLE-USER WAREHOUSE BUILDING WITH AN ANCILLARY OFFICE BLOCK INVOLVING A SINGLE-STOREY WAREHOUSE ON LOT 5533 MK 5 AT NO. 30 BOON LAY WAY |
|
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$246,425.44 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Aug-00 |
|
|
ARCHITECTS |
HK HIA & ASSOCIATES |
ENGINEERS |
PARTNERSHIP CONSUL |
OWNER: |
COUGAR HOLDINGS PTE LTD |
————– |
|
PROJECT: |
PROPOSED SUPLLY & INSTALLATION OF CAST IN-SITU BORED PILES TO PROPOSED ERECTION OF AN 8-STOREY FACTORY BUILDING WITH A BASEMENT CARPARK ON LOT 2482T(PT) (PLOT A19621) AT JOO KOON CIRCLE |
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$690,041.90 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Sep-00 |
|
|
ARCHITECTS |
HK HIA & ASSOCIATES |
ENGINEERS |
PARTNERSHIP CONSUL |
OWNER: |
VICPLAS HOLDINGS PTE LTD |
————– |
|
PROJECT: |
PROPOSED 4-STOREY BISHAN FIRE STATION WITH A 7-STOREY TRAINING TOWER ON LOT 10812 PT MK 18 AT MARYMOUNT LANE/MARYMOUNT ROAD |
|
|
|
MAIN CONTR: |
DE FENG CONST. PTE LTD |
Contract Sum: |
$493,600.00 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Sep-00 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
2nd CD Division |
PROJECT: |
PROPOSED ERECTION OF ONE PRIMARY SCHOOL DEVELOPMENT COMPRISING OF 6 BLK OF 4-STOREY BLDGS. AND 1 BLK OF 4-STOREY OTHER ANCILLARY BLDG ON LOT 1437 PT MK 11 AT TECK WHYE CRESCENT/STAGMONT ROAD-BP NO: GA -927-010-1999-BP01 (R.C PILING WORKS FOR ACCESS ROAD DRAIN ) |
|
|
|
|
|
MAIN CONTR: |
SAL Const Pte Ltd |
Contract Sum: |
$165,664.89 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Sep-00 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 12
|
|
|
PROJECT: |
PROPOSED ERECTION OF 5-STOREY SINGLE USER INDUSTRIAL DEVELOPMENT ON PLOT 1 & 2 LOT 5546 K MK 23 UBI AVE 3/UBI ROAD 4 |
|
|
|
MAIN CONTR: |
Kwan Yong Const Pte Ltd |
Contract Sum: |
$293,443.00 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Nov-00 |
|
|
ARCHITECTS |
DCA ARCHITECTS PTE LTD |
ENGINEERS |
MAUNSELL CONSULTANTS (S) PTE LTD |
OWNER: |
ARCASIA (UBI) PTE LTD |
————– |
|
|
|
PROJECT: |
PROPOSED DESIGN, DEVELOPMENT & CONSTRUCTION OF PRIMARY SCHOOL AT WOODLANDS SITE 10, SENGKANG SITE 18 & PUNGGOL SITE (CONTRACT NO: MOE/SDO/BLD/2000/060) |
|
|
|
|
MAIN CONTR: |
DEENN ENGRG PTE LTD |
Contract Sum: |
$181,167.00 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Nov-00 |
|
|
ARCHITECTS |
James Goh & Partners Pte Ltd |
ENGINEERS |
T.Y. Lin South East Asia Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY BLOCK & A & A TO EXISTING TAO NAN SCHOOL ON LOTS(S) 5403 & 7659 MK 26 AT NO. 49 MARINE CRESCENT |
|
|
|
MAIN CONTR: |
Toh Seng Sit Const. Pte Ltd |
Contract Sum: |
$316,210.00 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Mar-01 |
|
|
ARCHITECTS |
CAIDE Architects |
ENGINEERS |
LTL Engrg. Consultants |
OWNER: |
Singapore Hokien Huay Kuan |
————– |
|
|
|
PROJECT: |
PROPOSED BORED PILING FOR CONSTRUCTION OF MACPHERSON SECONDARY SCHOOL AT CIRCUIT ROAD |
|
|
|
MAIN CONTR: |
SAL CONST. PTE LTD |
Contract Sum: |
$1,235,360.88 |
TYPE OF JOB: |
BORED PILING WORKS |
Completion: |
Apr-01 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PROPOSED PIONEER JUNIOR COLLEGE ON LOT(S) 1437 PT MK 11 AT TECK WHYE CRESCENT |
|
|
|
MAIN CONTR: |
SAL CONST. PTE LTD |
Contract Sum: |
$2,526,019.50 |
TYPE OF JOB: |
Bored Piling & R.C Piling Works |
Completion: |
May-01 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
REBUILDING OF BEDOK SOUTH SECONDARY SCHOOL AT JALAN LANGGAR BEDOK |
|
|
MAIN CONTR: |
SAL CONST. PTE LTD |
Contract Sum: |
$3,000,274.00 |
TYPE OF JOB: |
BORED PILING WORKS |
Completion: |
Jul-01 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 13
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE-STOREY FOOD CENTRE WITH 3-STOREY 22/6.6 KV SUBSTATION & BIN CENTRE AT SHIPYARD ROAD |
|
|
|
MAIN CONTR: |
YOONG CHANG CONST PTE LTD |
Contract Sum: |
$270,130.00 |
TYPE OF JOB: |
Bored Piling & R.C Piling Works |
Completion: |
Jul-01 |
|
|
ARCHITECTS |
JTC Consultants (S) Pte Ltd |
ENGINEERS |
JTC Consultants (S) Pte Ltd |
OWNER: |
JTC Corporation |
————– |
|
|
|
PROJECT: |
PROPOSED BORED PILE FOR PROPOSED A & A TO THE EXISTING 2-STOREY SPORTS & RECREATION CENTRE FOR NANYANG TECHNOLOGICAL UNIVERSITY |
|
|
|
MAIN CONTR: |
W Y Steel Const Pte Ltd |
Contract Sum: |
$127,514.20 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Aug-01 |
|
|
ARCHITECTS |
PWD |
ENGINEERS |
PWD |
OWNER: |
PWD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 14
|
|
|
PROJECT: |
PROPOSED ADDITIONS & ALTERATION TO HOUGANG SPORTS HALL FOR SINGAPORE SPORTS COUNCIL |
|
|
|
MAIN CONTR: |
W Y Steel Const Pte Ltd |
Contract Sum: |
$127,514.20 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Aug-01 |
|
|
ARCHITECTS |
Consulltants Incorporated |
ENGINEERS |
Alberts LP Loh Consultants |
OWNER: |
Singapore Sports Council |
————– |
|
|
|
PROJECT: |
PROPOSED UPGRADING OF PEI DAO SECONDARY SCHOOL FOR EXISTING FIRST TOA PAYOH SECONDARY SCHOOL ON LOTS 4271, 4272 & 6781 MK 17 AT NO. 580 TOA PAYOH EAST |
|
|
|
MAIN CONTR: |
L.S. CONST. PTE LTD |
Contract Sum: |
$939,502.14 |
TYPE OF JOB: |
Bored Piling & R.C Piling Works |
Completion: |
Nov-01 |
|
|
ARCHITECTS |
Lee Sian Teck Architects Pte Ltd |
ENGINEERS |
B C Koh Consulting Engineers |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF ONE SECONDARY SCHOOL DEVELOPMENT COMPRISING OF 3 BLK OF 4-STOREY, 2 BLK OF 3 STOREY AND OTHER ANCILLARY BUILDINGS ON LOTS 3782 PT MK 13 AT WOODLANDS CRESCENT (WOODLANDS SITE 21A) |
|
|
|
|
MAIN CONTR: |
Lain Hock Huat Const Pte Ltd |
Contract Sum: |
$291,081.20 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Nov-01 |
|
|
ARCHITECTS |
PWDConsultants Pte Ltd |
ENGINEERS |
PWDConsultants Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PILING WORKS FOR JTC STACK UP & RAMP UP FACTORIES AT WOODLANDS SPECTRUM PHASE 2 |
|
|
|
MAIN CONTR: |
DEENN ENGRG PTE LTD |
Contract Sum: |
$1,060,700.00 |
TYPE OF JOB: |
Spun Piling & R.C Piling Works |
Completion: |
Dec-01 |
|
|
ARCHITECTS |
JTC Corporation |
ENGINEERS |
T.Y. Lin South East Asia Pte Ltd |
OWNER: |
JTC Corporation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 15
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY HALL CUM CANTEEN BLOCK AND 4-STOREY TEACHING BLOCK AND ADDITION & ALTERATIONS TO EXISTING PUNGGOL PRIMARY SCHOOL ON LOT 7800 MK 22 HOUGANG AVE 8 |
|
|
|
|
MAIN CONTR: |
Neo Corporation Pte Ltd |
Contract Sum: |
$811,506.40 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Jan-02 |
|
|
ARCHITECTS |
Caidesign Architects |
ENGINEERS |
Fong Consult |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 8-STOREY LIGH INDUSTRIAL MULTIPLE-USER FACTORY WITH A BASEMENT ON LOT(S) 4427 PT SL (04427L) MEW LOT 5312PT) (PLOT 5 OF URA LAND PARCELS 542 & 543) MK 23 AT UBI AVE /UBI ROAD 3 |
|
|
|
|
|
|
MAIN CONTR: |
Union Contractors (S) Pte Ltd |
Contract Sum: |
$192,027.20 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Mar-02 |
|
|
ARCHITECTS |
IMT Architects |
ENGINEERS |
ASE Designtec |
|
|
OWNER: |
Hola Development Pte Ltd |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE STOREY CHILD DAY-CARE CENTRE AND 2-STOREY KINERGARTEN ON LOT 1323 PT MK 16 AT CHESTNUT DRIVE (R.C PILING WORKS) |
|
|
|
|
|
MAIN CONTR: |
Project Bldg. Const. (Pte) Ltd |
Contract Sum: |
$259,464.50 |
TYPE OF JOB: |
R.C Piling Works |
Completion: |
Apr-02 |
|
|
ARCHITECTS |
DPC Development Consultants |
ENGINEERS |
DPC Consulting Engineers |
|
|
OWNER: |
Titular Roman Catholic Archbishop Of Singapore |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 5-STOREY BLOCK OF RESIDENTIAL FLATS (TOTAL 21 UNITS) WITH AN ATTIC A BASEMENT CARPARK AND SWIMMING POOL ON LOT(S) 2747 2748 MK 02 AT 69 HOLLAND ROAD |
|
|
|
|
|
|
MAIN CONTR: |
Bored Piling (Pte) Ltd |
Contract Sum: |
$505,000.00 |
TYPE OF JOB: |
Bored Piling Works |
Completion: |
Jun-02 |
|
|
ARCHITECTS |
SCDA Architects |
ENGINEERS |
Hainal-Konyi (S) Pte Ltd |
OWNER: |
Goldpus Investments Pte Ltd |
|
|
|
|
PROJECT: |
AMENDMENT TO APPROVED 2 BLK OF 21-STOREY & 3 BLK OF 24-STY RESI FLATS (TOTAL 616 UNITS) WITH CAR PARK WITH TENNIS CTS @ ROOF WITH CLUB HOUSE S/POOL & COM FACILITIES ON LOT (S) 6350A AT WEST COAST CRESCENT |
|
|
|
|
|
|
MAIN CONTR: |
Lian Beng Const. (1988) Pte Ltd |
Contract Sum: |
$2,500,000.00 |
TYPE OF JOB: |
Bored Piling & R.C Piling Works |
Completion: |
Aug-02 |
|
|
ARCHITECTS |
Ong & Ong Architects |
ENGINEERS |
Tan Ee Ping & Partners |
OWNER: |
Blue Horizon Properties Pte Ltd |
————– |
|
|
|
PROJECT: |
DESIGN & BUILD PROJECT FOR LOGISTIC CLUSTER IN KRANJI CAMP AT CHOA CHU KANG WAY |
|
|
|
|
|
MAIN CONTR: |
Deenn Engrg. Pte Ltd |
Contract Sum: |
$383,080.00 |
TYPE OF JOB: |
R.C Piling |
Completion: |
Sep-02 |
|
|
ARCHITECTS |
|
ENGINEERS |
T.Y.Lin South East Asia Pte Ltd |
OWNER: |
DSTA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 16 |
|
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY OF CLASSROOM BLOCK AND A & A TO EXISTING YANGZHENG PRIMARY SCHOOL ON LOT 6047 MK 17 AT SERANGOON AVE 3 |
|
|
|
|
|
MAIN CONTR: |
Poh Lian Const. Pte Ltd |
Contract Sum: |
$397,091.40 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Sept. 02 |
|
|
ARCHITECTS |
CPG Consultants Pte Ltd |
ENGINEERS |
T.Y.Lin South East Asia Pte Ltd |
OWNER: |
Ministry Of Education – Yangxheng Primary School |
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF NANHUA SECONDARY SCHOOL DEVELOPMENT COMPRISING 7 BLOCK OF 3 TO 6 STOREY BUILDING AND OTHER ANCILLARY BUILDING ON LOT 2963 PT (SL) MK 3 AT CLEMENTI AVE 1 ON LOT(S) 2963 PT MK 03 AT CLEMENTI AVE 1 |
|
|
|
|
|
|
MAIN CONTR: |
Precise Development Pte Ltd |
Contract Sum: |
$1,739,400.00 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Sept. 02 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
|
|
|
|
PROJECT: |
PROPOSED ERECTION OF SERANGOON GARDEN SECONDARY SCHOOL ON LOT 534PT SL MK 28 AT SERANGOON NORTH AVE 1 |
|
|
|
|
|
MAIN CONTR: |
Kin Lin Builders Pte Ltd/Southern E Int’L (S) Pte Ltd |
Contract Sum: |
$1,330,245.00 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Oct-02 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
PROPOSED PILING AND PILECAP WORKS FOR PROPOSED ERECTION OF A PART 3 & PART 2 STOREY INDUSTRIAL FACTORY BUILDING WITH ANCILLARY OFFICE & SUB-STATION ON LOT 651C MK 11 AT KRANJI WAY |
|
|
|
|
|
|
MAIN CONTR: |
LIM SING PILING PTE LTD |
Contract Sum: |
$330,000.00 |
TYPE OF JOB: |
R.C Piling & PileCap Construction |
Completion: |
Oct-02 |
|
|
ARCHITECTS |
HS Consultants |
ENGINEERS |
HS Consultants |
OWNER: |
Chng Woodworking Pte Ltd |
————– |
|
|
|
PROJECT: |
PROPOSED NEW ERECTION AT EXISTING CRESCENT GIRL’S SECONDARY SCHOOL COMPRISING 1 NEW BLOCK OF 4-STOREY CLASSROOM BUILDING AND 1 BLOCK OF SUB-STATION / BIN CENTRE AND ADDITIONS / ALTERATIONS TO EXISTING BUILDINGS ON LOTS 149-21 SL AND 185 SL TS 24 AT PRINCE CHARLES CRESCENT (BORED PILING WORKS) |
|
|
|
|
|
|
|
|
MAIN CONTR: |
Kwan Yong Const Pte Ltd |
Contract Sum: |
$189,236.75 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Oct-02 |
|
|
ARCHITECTS |
PWD Consultants Pte Ltd |
ENGINEERS |
PWD Consultants Pte Ltd |
OWNER: |
Ministry Of Education |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD -TRACK RECORD 17
|
|
|
PROJECT: |
PROPOSED ERECTION OF 5-UNIT OF 2-STOREY BUNGALOWS WITH SWIMMING POOL & 3 UNIT OF 2-STOREY BUNGALOWS WITH BASEMENT AND SWIMMING POOL 7 1 UNIT ELECTRICAL SUBSTATION AT TYERSALL/GALLOP ROAD |
|
|
|
|
|
|
MAIN CONTR: |
Daiya Engineering & Construction Pte Ltd |
Contract Sum: |
$215,157.25 |
TYPE OF JOB: |
R C Piling/Bored Piling |
Completion: |
Feb-03 |
|
|
|
|
ARCHITECTS |
Architects 61 |
|
|
ENGINEERS |
KTP Consultants Pte Ltd |
|
|
OWNER: |
The Great Eastern Life Assurance Co Ltd |
|
|
————– |
|
|
|
PROJECT: |
CONSTRUCTION OF SLE/WOODLANDS AVENUE 12 INTERCHANGE (BALANCE OF WORKS) |
|
|
|
|
|
MAIN CONTR: |
TeamBuild Construction Pte Ltd |
Contract Sum: |
$229,800.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-03 |
|
|
|
|
ARCHITECTS |
HDB |
|
|
ENGINEERS |
HDB |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED CONDOMINIUM HOUSING DEVELOPMENT COMPRING 3 BLK OF 17 STOREY & 3 BLK OF 16 STOREY RESIDENTIAL FLAT WITH 1 BLK OF 5-STOREY MULTI-STOREY CARPARK 3 SWIMMING POOL ON LOTS 3897W PT & 4067V PT MK 13 AT ROSEWOOD DR/WOODLANDS AVE 2 |
|
|
|
|
|
|
|
MAIN CONTR: |
Chiu Teng Enterprise Pte Ltd |
Contract Sum: |
$1,390,412.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-03 |
|
|
|
|
ARCHITECTS |
DP Architects Pte Ltd |
|
|
ENGINEERS |
Meinhardt (Singapore) Pte Ltd |
|
|
OWNER: |
Mediterranean Properties Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY COMMUNITY CLUB WITH A BASEMENT ON LOT 1296PT MK 29 AT PASIR RIS DRIVE 3 |
|
|
|
|
|
MAIN CONTR: |
Kay Lim Const & Trading Pte Ltd |
Contract Sum: |
$318,112.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-03 |
|
|
|
|
ARCHITECTS |
P & T Consultants Pte Ltd |
|
|
ENGINEERS |
T.Y. Lin South East Asia Pte Ltd |
|
|
OWNER: |
People’s Associates |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITION AND ALTERNATION TO EXISTING 5-STOREY HOLY INNOCENTS’ PRIMARY SCHOOL INVOLVING ADDITION OF 4-STOREY EXTENSION BLOCK AND ONE 2-STOREY MULTI-PURPOSE BUILDING BLOCK WITH NEW SUBSTATION AND BIN CENTRE ON LOT 3644/MK 22 AT LORONG LOW KOON |
|
|
|
|
|
|
|
MAIN CONTR: |
Toh Seng Sit Construction Pte Ltd |
Contract Sum: |
$333,198.39 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Jul-03 |
|
|
|
|
ARCHITECTS |
LT&T Architects |
|
|
ENGINEERS |
EJ Consultants Pte Ltd |
|
|
OWNER: |
Holy Innocents’ Primary School |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 18
|
|
|
PROJECT: |
PROPOSED CONDOMINIUM HOUSING DEVELOPMENT COMPRISING 1 BLOCK OF 19-STOREY RESIDENTIAL BUILDING (TOTAL : 49 UNITS) WITH 2 LEVELS OF CARPARK, SWIMMING POOL CLUBHOUSE AND COMMUNAL FACILITIES ON LOT 693V & 695T TS 29 AT BALESTIER ROAD |
|
|
|
|
|
|
|
MAIN CONTR: |
Nakano Singapore (Pte) Ltd |
Contract Sum: |
$277,604.60 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Jul-03 |
|
|
|
|
ARCHITECTS |
P & T Consultants Pte Ltd |
|
|
ENGINEERS |
P & T Consultants Pte Ltd |
|
|
OWNER: |
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED DEMOLITION OF EXISTING BRIDGECRANE STRUCTURE AND CONSTRUCTION OF GANTRY BEAMS AND STACKING BEAMS FOR RTG AT BRANI TERMINAL |
|
|
|
|
|
|
MAIN CONTR: |
Hao Da Pte Ltd |
Contract Sum: |
$218,304.00 |
TYPE OF JOB: |
R.C Piling |
Completion: |
Sep-03 |
|
|
|
|
ARCHITECTS |
PSA |
|
|
ENGINEERS |
PSA |
|
|
OWNER: |
PSA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED A & A WORK TO BARTLEY SECONDARY SCHOOL |
|
|
|
|
MAIN CONTR: |
Teambuild Construction Pte Ltd |
Contract Sum: |
$488,386.62 |
TYPE OF JOB: |
Bored piling |
Completion: |
Nov-03 |
|
|
|
|
ARCHITECTS |
CPG Consultants Pte Ltd |
|
|
ENGINEERS |
CPG Consultants Pte Ltd |
|
|
OWNER: |
Ministry Of Education |
|
|
————– |
|
|
|
PROJECT: |
SUPPLY AND INSTALLATION OF BORED PILE FOR PROPOSED ERECTION OF 3-STOREY AWWA CENTRE FOR CARE, EDUCATION AND SOCIAL SERVICES (A.C.C.E.S.S) AT LORONG NAPIRI & HOUGANG STREET 92 MK 22 LOT 8790M |
|
|
|
|
|
|
MAIN CONTR: |
JSD Const Pte Ltd |
Contract Sum: |
$716,115.00 |
TYPE OF JOB: |
BORED PILING/R.C PILING |
Completion: |
Dec-03 |
|
|
|
|
ARCHITECTS |
D-Exodus Architects & Planner Pte |
|
|
ENGINEERS |
T Y Lin (Sea) Pte Ltd |
|
|
OWNER: |
Asian Women Welfare association |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED BORED PILING WORKS FOR PROPOSED CHIJ PRIMARY AND SECONDRY SCHOOL AT TOA PAYOH LORONG 1 |
|
|
|
|
|
MAIN CONTR: |
Deenn Engineering Pte Ltd |
Contract Sum: |
$1,747,200.00 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Feb-04 |
|
|
|
|
ARCHITECTS |
Team Design Architects Pte Ltd |
|
|
ENGINEERS |
Babtie Harris & Sutherland (Singapore) |
|
|
OWNER: |
Ministry Of Education |
————– |
|
|
|
PROJECT: |
TOA PAYOH N’HOOD 2 CONTRACT 10A (MARKET/FOOD CENTRE) |
|
|
|
|
MAIN CONTR: |
W Y Steel Pte Ltd |
Contract Sum: |
$231,519.60 |
|
|
Completion: |
Feb-04 |
ARCHITECTS |
HDB |
|
|
ENGINEERS |
HDB |
|
|
OWNER: |
HDB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 19
|
|
|
PROJECT: |
PROPOSED ERECTION OF 4 UNITS OF 2-STOREY DETACHED DWELLING HOUSE WITH AN ATTIC AND SWIMMING POOL ON LOTS 391-36 & 391-38 MK 17 AT 33/37 CHILTERN DRIVE |
|
|
|
|
|
|
MAIN CONTR: |
Guan Tong Const Pte Ltd |
Contract Sum: |
$72,405.54 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-04 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
T H Chuah & Partners |
|
|
OWNER: |
Mr. Kwee Tjoe Keng |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED CONCRETE DRY MIX PLANT AT PANDAN ROAD |
|
|
|
|
MAIN CONTR: |
Jian Yu Construction Pte Ltd |
Contract Sum: |
$163,025.08 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-04 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
Longrove & Associates |
|
|
OWNER: |
Jurong Cement Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED A & A TO EXISTING DEVELOPMENT AT 70-76 DALVEY RD |
|
|
|
|
MAIN CONTR: |
Kim Seng Heng Engrg Const (Pte) Ltd |
Contract Sum: |
$110,781.77 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-04 |
|
|
|
|
ARCHITECTS |
Axis Architects Planners |
|
|
ENGINEERS |
SMS Consulting Engineers |
|
|
OWNER: |
Heeton Holdings Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A PART 4 AND 3-STOREY CHURCH WITH ONE BASEMENT CARPARK ON LOT 166-18 TS24 AT 2 PRINCE CHARLES CRESCENT |
|
|
|
|
|
MAIN CONTR: |
ACI Architects Pte Ltd |
Contract Sum: |
$91,253.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
ACI Architects Pte Ltd |
|
|
ENGINEERS |
THK Consultant Engineers |
|
|
OWNER: |
The Diocese Of Singapore |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED BLDG WORK AT BUKIT BATOK N3 C11 (LINKWAY & PAVILLION) |
|
|
|
|
MAIN CONTR: |
Chip Eng Seng Contrs (1988) Pte Ltd |
Contract Sum: |
$61,463.20 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
HDB |
|
|
ENGINEERS |
HDB |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED UPGRADING OF EXISTING PING YI SECONDARY SCHOOL AT 61 CHAI CHEE STREET |
|
|
|
|
|
MAIN CONTR: |
Teambuild Construction Pte Ltd |
Contract Sum: |
$526,736.84 |
TYPE OF JOB: |
Bored piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
CPG Consultants Pte Ltd |
|
|
ENGINEERS |
CPG Consultants Pte Ltd |
|
|
OWNER: |
Ministry Of Education |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 20
|
|
|
PROJECT: |
PROPOSED A & A WORK TO BEDOK VIEW SECONDARY SCHOOL AT BEDOK SOUTH AVE 3 |
|
|
|
|
|
|
|
|
|
|
MAIN CONTR: |
Teambuild Construction Pte Ltd |
Contract Sum: |
$409,697.44 |
TYPE OF JOB: |
R C Piling & Bored piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
CPG Consultants Pte Ltd |
|
|
ENGINEERS |
CPG Consultants Pte Ltd |
|
|
OWNER: |
Ministry Of Education |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED BLDG WORK AT BUKIT BATOK N3 C11 (LINKWAY & PAVILLION) |
|
|
|
|
MAIN CONTR: |
Chip Eng Seng Contrs (1988) Pte Ltd |
Contract Sum: |
$61,463.20 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
HDB |
|
|
ENGINEERS |
HDB |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED NEW ERECTION OF A BLOCK OF 7 STOREY RESIDENTIAL FLAT ON LOT 97444T MK 17 AT 23 MEYAPPA CHETTIAR ROAD |
|
|
|
|
|
MAIN CONTR: |
Environ Construction Co Pte Ltd |
Contract Sum: |
$128,595.65 |
TYPE OF JOB: |
R C Piling & Bored Piling |
Completion: |
Jul-04 |
|
|
|
|
ARCHITECTS |
K C Chan Architect |
|
|
ENGINEERS |
Mtech Consultants |
|
|
OWNER: |
Siem Development Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2 UNIT OF 2-STOREY DETACHED DWELLING HOUSES WITH 1 UNIT OF BASEMENT ON LOT 3107 MK 4 AT 22 LEEDON ROAD |
|
|
|
|
|
MAIN CONTR: |
Techkon Pte Ltd |
Contract Sum: |
$72,120.23 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-04 |
|
|
|
|
ARCHITECTS |
I W Studio |
|
|
ENGINEERS |
Hainal-Konyi (S) Pte Ltd |
|
|
OWNER: |
Lee Song Lin |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2 UNITS OF 2-STOREY DETACHED DWELLING HOUSE WITH PROVISION OF A SWIMMING POOL ON LOT 31-106 MK 17 AT 18 JOAN ROAD |
|
|
|
|
|
MAIN CONTR: |
Daiya Engrg & Const Pte Ltd |
Contract Sum: |
$199,133.79 |
TYPE OF JOB: |
R C Piling & Bored Piling |
Completion: |
Jul-04 |
|
|
|
|
ARCHITECTS |
Liu & Wo Architects Pte Ltd |
|
|
ENGINEERS |
JS Tan & Associates |
|
|
OWNER: |
Ms Huang Lui |
|
|
|
|
|
|
PROJECT: |
PROPOSED CONDOMINIUM HOUSING DEVELOPMENT AT NO. 1 FORT ROAD |
|
|
|
|
MAIN CONTR: |
Chip Eng Seng Contr (1988) Pte Ltd |
Contract Sum: |
$104,399.45 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-04 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
K P Chai Engrg & Mgmt Consultants |
|
|
OWNER: |
Chip Eng Seng Contr (1988) Pte Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 21
|
|
|
PROJECT: |
BUILDING WORK AT SENGKANG N2C29 & C30 |
|
|
|
|
|
|
MAIN CONTR: |
Chip Hup Hup Kee Construction Pte Ltd |
Contract Sum: |
$135,004.40 |
TYPE OF JOB: |
R C Piling |
Completion: |
Nov-04 |
|
|
|
|
ARCHITECTS |
HDB |
|
|
ENGINEERS |
CESMA International Pte Ltd |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
D2002-01804-030 PASIR LABA CAMP REDEVELOPMENT FOR SISPEC |
|
|
|
|
MAIN CONTR: |
Lian Beng Construction Pte Ltd |
Contract Sum: |
$118,640.20 |
TYPE OF JOB: |
R C Piling |
Completion: |
Nov-04 |
|
|
|
|
ARCHITECTS |
HCF And associates |
|
|
ENGINEERS |
Meinhardt (Singapore) Pte Ltd |
|
|
OWNER: |
Defence Science & Technology Agency |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED MRT PROJECT CONTRACT C822 – CIRCLE LINE |
|
|
|
|
MAIN CONTR: |
Bored Piling (Pte) Ltd |
Contract Sum: |
$13,800,000.00 |
TYPE OF JOB: |
Bored Piling/Steel H-Piling |
Completion: |
Dec-04 |
|
|
|
|
ARCHITECTS |
LTA |
|
|
ENGINEERS |
LTA |
|
|
OWNER: |
LTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2 A 2-STOREY BUNGALOW WITH SWIMMING POOL ON LOT NO. 99400 MK 16 AT NO. 6 CHESTNUT CLOSE |
|
|
|
|
|
MAIN CONTR: |
W Y Steel Pte Ltd |
Contract Sum: |
$158,858.00 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Feb-05 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
NCK Associates |
|
|
OWNER: |
Lim Joo Suan |
————– |
|
|
|
PROJECT: |
ADDITIONS AND ALTERATION TO ZHENGHUA PRIMARY SCHOOL AT 9 FAJAR ROAD |
|
|
|
|
MAIN CONTR: |
Toh Seng Sit Const Pte Ltd |
Contract Sum: |
$493,229.74 |
TYPE OF JOB: |
Bored Piling |
Completion: |
May-05 |
|
|
|
|
ARCHITECTS |
CPG Consultants Pte Ltd |
|
|
ENGINEERS |
CPG Consultants Pte Ltd |
|
|
OWNER: |
MOE |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF MULTIPLE-USER IND DEVELOPMENT COMPRISING OF 12 UNITS TERRACE FACTORY AT KRANJI LINK |
|
|
|
|
|
MAIN CONTR: |
Soilbuild Pte Ltd |
Contract Sum: |
$202,574.00 |
TYPE OF JOB: |
R.C Piling |
Completion: |
May-05 |
|
|
|
|
ARCHITECTS |
AC Consortium Pte Ltd |
|
|
ENGINEERS |
TC Sin & Associates |
|
|
OWNER: |
Soilbuild Pte Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 22
|
|
|
PROJECT: |
PROPOSED A & A AND EXTENSION OF 4-STY STUDENT HOSTEL BLK & 4-STY LACTURE HALL BLK AT 15 GREEN LANE |
|
|
|
|
|
MAIN CONTR: |
H P Construction Pte Ltd |
Contract Sum: |
$150,685.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-05 |
|
|
|
|
ARCHITECTS |
Chartered Architects International |
|
|
ENGINEERS |
Engineers Incorporated |
|
|
OWNER: |
Chin Lien Bible Seminary |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED 2 BLOCK OF 5-STOREY RESIDENTIAL DEVELOPMENT WITH BASEMENT ON LOT 9299T MK 26 AT LORONG 110 CHANGI |
|
|
|
|
|
MAIN CONTR: |
TPS Construction Pte Ltd |
Contract Sum: |
$106,690.50 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-05 |
|
|
|
|
ARCHITECTS |
ADT Architects Design Team |
|
|
ENGINEERS |
LBW Consultants |
|
|
OWNER: |
MCL Land (Serangoon) Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED 1/3/4/6/8 STOREY BASIC RESCUE TRAINING CENTRE ON LOTS 400PT,654PT & 397 MK 9 AT JALAN BAHAR |
|
|
|
|
|
MAIN CONTR: |
Kim Seng Heng Engrg Const Pte Ltd |
Contract Sum: |
$323,000.00 |
TYPE OF JOB: |
R.C Piling |
Completion: |
Jun-05 |
|
|
|
|
ARCHITECTS |
MHA Consultants |
|
|
ENGINEERS |
MHA Consultants |
|
|
OWNER: |
Ministry Of Home Affairs |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED PILING WORK FOR ANDERSON SECONDARY SCHOOL AT 10 ANG MO KIO STREET 53 |
|
|
|
|
|
MAIN CONTR: |
Koyo Planner One JV |
Contract Sum: |
$152,022.55 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Jun-05 |
|
|
|
|
ARCHITECTS |
CPG |
|
|
ENGINEERS |
CPG |
|
|
OWNER: |
MOE |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED GOOD CLASS BUNGALOW DEVELOPMENT AT CABLE RD / NATHAN ROAD |
|
|
|
|
MAIN CONTR: |
Obayashi Corporation |
Contract Sum: |
$320,000.00 |
TYPE OF JOB: |
R.C Piling |
Completion: |
Jul-05 |
|
|
|
|
ARCHITECTS |
Team Design Architects Pte Ltd |
|
|
ENGINEERS |
CP Lim & Partners |
|
|
OWNER: |
Straits Development Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 4 UNITS 2-STORY DETACHED DWELLING HOUSES EACH WITH A BASEMENT AND ATTIC ON LOTS 7333C & 7334m MK 17 AT NO 78 ANDREW ROAD/THOMSON RD |
|
|
|
|
|
|
MAIN CONTR: |
Lim Sing Piling Pte Ltd |
Contract Sum: |
$206,020.99 |
TYPE OF JOB: |
R C Piling |
Completion: |
Dec-05 |
|
|
|
|
ARCHITECTS |
Associated Civic – Akitek |
|
|
ENGINEERS |
KTP Consultants Pte Ltd |
|
|
OWNER: |
KDB-Caldecott Development Pte Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 23
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY FACTORY WITH DORMITORY ON LOT 3877L )PLOT A2040800 MK 6 AT CHIN BEE AVE |
|
|
|
|
|
MAIN CONTR: |
Lim Sing Piling Pte Ltd |
Contract Sum: |
$121,260.70 |
TYPE OF JOB: |
R C Piling |
Completion: |
Oct-05 |
|
|
|
|
ARCHITECTS |
M-Team Consortium |
|
|
ENGINEERS |
M-Team Consortium |
|
|
OWNER: |
Hu Lee Impex Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED MRT PROJECT CONTRACT C822 – CIRCULAR LINE – DEPRESSED RD (BRE) – PHASE 2 – TENSION PILE |
|
|
|
|
|
MAIN CONTR: |
Econ – NCC JV |
Contract Sum: |
$230,579.30 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Feb-06 |
|
|
|
|
ARCHITECTS |
LTA |
|
|
ENGINEERS |
LTA |
|
|
OWNER: |
LTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITIONAL HANGER AND 3 STOREY OFFICE TO EXISTING HANGER ON LOT 3032M-PT MK 20 AT 500 WEST CAMP ROAD SELATAR AIRPORT |
|
|
|
|
|
MAIN CONTR: |
Wang Fung Construction Pte td |
Contract Sum: |
$202,533.00 |
TYPE OF JOB: |
R C piling |
Completion: |
Apr-06 |
|
|
|
|
ARCHITECTS |
T H Chuah & Partners |
|
|
ENGINEERS |
T H Chuah & Partners |
|
|
OWNER: |
ST Aerospace Engineering Pte Ltd |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED COMMUNITY CLUB AT SEMBAWANG CRESCENT |
|
|
|
|
MAIN CONTR: |
Wacon Construction Pte Ltd |
Contract Sum: |
$378,000.00 |
TYPE OF JOB: |
Bored Piling |
Completion: |
May-06 |
|
|
|
|
ARCHITECTS |
CPG |
|
|
ENGINEERS |
CPG |
|
|
OWNER: |
People’s Association |
|
|
|
|
|
|
PROJECT: |
PROPOSED LANDED HOUSING DEVELOPMENT (PHASE 1cA-1) COMPRISING 18 UNITS OF 3-STOREY TERRACE HOUSES ON LOT 2459 PT MK 10 AT BUKIT BATOK ROAD |
|
|
|
|
|
MAIN CONTR: |
Seah Construction Pte Ltd |
Contract Sum: |
$161,329.56 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-06 |
|
|
|
|
ARCHITECTS |
RSP Architects Planners & Engineers (pte) Ltd |
|
|
ENGINEERS |
KTP Consultants Pte Ltd |
|
|
OWNER: |
Allgreen Properties Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
SOIL IMPROVEMENT FOR TANK FARM 19-T1904 AT JURONG ISLAND |
|
|
|
|
MAIN CONTR: |
Keller Foundation (S.E.A) Pte Ltd |
Contract Sum: |
$194,275.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-06 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
Engineers 9000 Pte Ltd |
|
|
OWNER: |
Oiltanking Singapore Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 24
|
|
|
PROJECT: |
PROPOSED ERECTION OF 32 UNITS INDUSTRIAL DEVELOPMENT WITH A BLK OF CANTEEN CUM SUBSTATION AND A UNIT OF GUARD HOUSE CUM BIN CENTRE ON LOT 02908A MK 7 AT PIONEER RD/BENOI RD |
|
|
|
|
|
|
MAIN CONTR: |
Soil Build Pte Ltd |
Contract Sum: |
$438,426.67 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-06 |
|
|
|
|
ARCHITECTS |
A C Consortium |
|
|
ENGINEERS |
C P Lim & Partners |
|
|
OWNER: |
SB (Pioneer) Investment Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED MRT PROJECT CONTRACT C822 – CIRCULAR LINE – DEPRESSED RD (BRE) – PHASE 2 – FOUNDATION PILE |
|
|
|
|
|
MAIN CONTR: |
Econ – NCC JV |
Contract Sum: |
$1,784,589.18 |
TYPE OF JOB: |
Bored Piling |
Estimate Completion: |
Jul-06 |
|
|
|
|
ARCHITECTS |
LTA |
|
|
ENGINEERS |
LTA |
|
|
OWNER: |
LTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY SINGLE USER DETACHED FACTORY WITH OFFICE ON LOT 3323X PLOT A0612400 MK 7 AT TUAS AVE 8 |
|
|
|
|
|
MAIN CONTR: |
Thonheng Piling & Construction Pte Ltd |
Contract Sum: |
$317,458.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
Aug-06 |
|
|
|
|
ARCHITECTS |
AC Consortium Pte Ltd |
|
|
ENGINEERS |
LSW Consulting Engineers |
|
|
OWNER: |
SMC Preumatics (SEA) Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED MRT PROJECT CONTRACT C822 – CIRCULAR LINE – DEPRESSED RD (BRE) – PHASE 2 – SECANT PILE |
|
|
|
|
|
MAIN CONTR: |
Econ – NCC JV |
Contract Sum: |
$2,332,704.90 |
TYPE OF JOB: |
Bored Piling |
Completion: |
Sep-06 |
|
|
|
|
ARCHITECTS |
LTA |
|
|
ENGINEERS |
LTA |
|
|
OWNER: |
LTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED DEVELOPMENT OF JURONG CENTRAL PARK AT BOON LAY WAY/JALAN BOON LAY |
|
|
|
|
MAIN CONTR: |
Advanced Construction & Engineering Pte Ltd |
Contract Sum: |
$52,712.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-06 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
Lee & Lee Consultants |
|
|
OWNER: |
National Parks Board |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 25
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2 UNITS OF A 2-STOREY DETACHED HOUSES EACH WITH A BASEMENT & SWIMMING POOL ON LOT/S 1384K 1385N & 1386X MK 34 (B10B3-5) AT OCEAN DRIVE SENTOSA COVE |
|
|
|
|
|
|
MAIN CONTR: |
Daiya Engineering & Const Pte Ltd |
Contract Sum: |
$69,522.43 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-06 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
E123 Consultants |
|
|
OWNER: |
IJM Properties Sdn Bhd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED EXTENSION AND ADDITION TO EXISTING FACTORY ON LOT 07883P MK 5 AT 186 PANDAN LOOP |
|
|
|
|
|
MAIN CONTR: |
Techkon Pte Ltd |
Contract Sum: |
$68,950.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Oct-06 |
|
|
|
|
ARCHITECTS |
ATA Architects Pte |
|
|
ENGINEERS |
Y F Chan Consulting Engineers |
|
|
OWNER: |
Unitor Ships Service (S) Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
LIME SATURATION SYSTEM PROPOSE FOR EXISTING LIME PLANT AT TUAS DESALINATION PLANT |
|
|
|
|
MAIN CONTR: |
Tat Hin Builders Pte Ltd |
Contract Sum: |
$83,519.06 |
TYPE OF JOB: |
R C Piling |
Completion: |
Oct-06 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
CS Consulting Engineer |
|
|
OWNER: |
Hyfflux Hydrochem (S) Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED BOUGAINVILLEA GARDEN A 22KV ELECTRICAL SUBSTATION TOILETS SHELTERS AND OTHER IMPROVEMENT WORKS AT EAST COAST PARK |
|
|
|
|
|
MAIN CONTR: |
Suncity Contracts Pte Ltd |
Contract Sum: |
$144,145.93 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-07 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
MNA & Partner |
|
|
OWNER: |
National Parks Board |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY DETACHED DWELLING HOUSE WITH A SWIMMING POOL AND A BASEMENT ON LOT 1662K TS 24 AT JERVOIS HILL(PLOT 22) |
|
|
|
|
|
MAIN CONTR: |
Sysma Construction pte ltd |
Contract Sum: |
$93,656.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-07 |
|
|
|
|
ARCHITECTS |
Eco Id Architects |
|
|
ENGINEERS |
MSE Engineering & Management Consultants |
|
|
OWNER: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 26
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE STOREY WORKSHOP & STORE AND 2-STOREY ANCILLARY BUILDING WITH ANTENATOWER AT PANJANG TERMINAL |
|
|
|
|
|
MAIN CONTR: |
Logistic Construction Pte Ltd |
Contract Sum: |
$405,070.40 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-07 |
|
|
|
|
ARCHITECTS |
CPP Architects |
|
|
ENGINEERS |
PSA Corporation Ltd |
|
|
OWNER: |
PSA Corporation Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE STOREY FACTORY PART 3 STOREY ANCILLARY BUILDING ON LOT 2576L MK 07 AT TUAS AVE 9 |
|
|
|
|
|
MAIN CONTR: |
Brilliant General Building Construction Pte Ltd |
Contract Sum: |
$100,833.90 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-07 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
S H Ng Copnsultants |
|
|
OWNER: |
Zicom Holdings Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED RECONSTRUCTION TO EXISTING 2-STOREY DETACHED DWELLING HOUSE WITH A SWIMMING POOL ON LOT 96950K MK 25 AT NO 2 BROADRICK ROAD |
|
|
|
|
|
MAIN CONTR: |
Polink Engineering Pte Ltd |
Contract Sum: |
$95,289.50 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-07 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
J S Tan & Associates |
|
|
OWNER: |
|
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED HOTEL /RESORT DEVELOPMENT- CAPELLA SINAGPORE AT SENTOSA |
|
|
|
|
MAIN CONTR: |
Tiong Seng Contractors (Pte) Ltd |
Contract Sum: |
$77,584.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-07 |
|
|
|
|
ARCHITECTS |
DP Architects Pte Ltd |
|
|
ENGINEERS |
WEB Structures (Singapore) |
|
|
OWNER: |
Millenia Hotel Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITION & ALTERNATION INVOLVING ERECTION OF A NEW DUST COLLECTOR FOR EXISTING SINGLE-USER SINGLE-OCCUPIER INDUSTRIAL BUILDING ON LOT 3839P 3940W 3941V 3942P 3831L & 3832C MK 7 AT 32 TUAS SOUTH AVE 8 |
|
|
|
|
|
|
MAIN CONTR: |
Obayashi Corporation |
Contract Sum: |
$69,075.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-07 |
|
|
|
|
ARCHITECTS |
Architects 61 |
|
|
ENGINEERS |
C P Lim & Partners |
|
|
OWNER: |
NH Techno Glass Singapore Pte Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 27
|
|
|
PROJECT: |
PROPOSED ERECTION OF 38 UNITS 3-STROEY MULTIPLE-USER TERRACE FACTORY DEVELOPMENT WITH A BLOCK OF CANTEEN WITH SUBSTATION ON LOT 5410W MK 7 AT WOODLANDS INDUSTRIAL PARK E2/E9 |
|
|
|
|
|
|
MAIN CONTR: |
Aik Chuan Construction Pte Ltd |
Contract Sum: |
$466,055.70 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-07 |
|
|
|
|
ARCHITECTS |
AC Consortium |
|
|
ENGINEERS |
TC Sin & Assoociates |
|
|
OWNER: |
Evan Lim & Co Pte Ltd |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITION OF COVERED PETROL DISPENSER AREA (POL POINT) TO EXISTING SEMBAWANG CAMP ON LOT 04618A 04616P-PT 01319C & 01080T MK 13 AT ADMIRALTY ROAD WEST |
|
|
|
|
|
|
MAIN CONTR: |
RDE Construction Pte Ltd |
Contract Sum: |
$102,036.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-07 |
|
|
|
|
ARCHITECTS |
SD Architects |
|
|
ENGINEERS |
C P Lim & Partners |
|
|
OWNER: |
Defence Science & Technology Agency |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A SINGLE STY WORKSHOP & STORE AND A 2-STOREY ANCILLARY BUILDING WITH ANTENNA TOWER AT PASIR PANJANG P7, P8 & P9 AT WEST COAST HIGHWAY ON MK 3 LOT 3860P, 4220V |
|
|
|
|
|
|
MAIN CONTR: |
Logistics Const Pte Ltd |
Contract Sum: |
$433,425.28 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-07 |
|
|
|
|
ARCHITECTS |
CPP Architects |
|
|
ENGINEERS |
PSA |
|
|
OWNER: |
PSA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF ONE BLOCK OF 4-STY IND. BLDG. ON LOT 4768p (PLOT A19807) MK 5 AT 206 PANDAN LOOP |
|
|
|
|
|
MAIN CONTR: |
Kenston Const Pte Ltd |
Contract Sum: |
$171,455.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Aug-07 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
CS Consultanting Engineers |
|
|
OWNER: |
Seawaves Frozan Food Pte Ltd |
|
|
PROJECT: |
PROPOSED NEW ERECTION OF 11-BLOCK OF 5-STY WITH ATTIC CONDOMINIUM HOSING DEVELOPMENT (TOTAL 140 UNITS) COMPRISING OF BASEMENT CARPARK, COMMUNAL FACILITIES AND SWIMMING POOL ON LOT 0118t AND O1120P MK 13 AT JALAN MATA AYER |
|
|
|
|
|
|
|
MAIN CONTR: |
Lian Beng Const (1988) Pte Ltd |
Contract Sum: |
$1,500,370.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Dec-07 |
|
|
|
|
ARCHITECTS |
Design Link Architects |
|
|
ENGINEERS |
LBW Consultants LLP |
|
|
OWNER: |
UIC Investment Pte Ltd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 28
|
|
|
PROJECT: |
PROPOSED NEW ERECTION OF 4-STY FACTORY (WITH ADMINISTRATIVE OFFICES AND ROOF TERRACE) ON LOT 4114L MK 31 AT 22 LOYANG LANE |
|
|
|
|
|
MAIN CONTR: |
T C Chua Const Pte Ltd |
Contract Sum: |
$218,910.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Dec-07 |
|
|
|
|
ARCHITECTS |
JAL ATELIER |
|
|
ENGINEERS |
YC Goh Consultants |
|
|
OWNER: |
AIR MARKET EXPRESS (S) PTE LTD |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 7-STOREY RESIDENTIAL DEVELOPMENT COMPROSING CARPARK ON THE 1ST AND 2ND STOREY, SWIMMIMG POOL ON THE 3RD STOREY AND APARTMENTS( 55 UNITS) ON THE REMAINING STOREYS AT 70-102 MACKENZIE ROAD |
|
|
|
|
|
MAIN CONTR: |
GALAXY BUILDERS PTE LTD |
Contract Sum: |
$114,494.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Dec-07 |
|
|
|
|
ARCHITECTS |
RONNY CHIN & ASSOCIATES |
|
|
ENGINEERS |
PORTWOOD & ASSOCIATES |
|
|
OWNER: |
GALAXY HOMES PTE LTD |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 8-STORET CLEAN & LIGHT INDUSTRIAL BUILDING AT 29 & 31 NEW INDUSTRIAL ROAD |
|
|
|
|
|
MAIN CONTR: |
KIM SENG HENG ENGRG CONST (PTE) LTD |
Contract Sum: |
$561,920.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-08 |
|
|
|
|
ARCHITECTS |
TEP CONSULTANTS PTE LTD |
|
|
ENGINEERS |
ARUP SINGAPORE PTE LTD |
|
|
OWNER: |
HO BEE REALTY PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED R C PILING WORKS FOR FACTORY JOB AT NO 50 TUAS AVE 1 |
|
|
|
|
|
MAIN CONTR: |
SOON SOON LEE CONST PTE LTD |
Contract Sum: |
$395,840.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-08 |
|
|
|
|
ARCHITECTS |
OEL ARCHITECTS INTRENATIONAL |
|
|
ENGINEERS |
M & P CONSULTING ENGINEERS |
|
|
OWNER: |
GALMON(S) PTE LTD |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED 3 BLOCKS OF PART SINGLE/PART 3-STOREY FACTORY DEVELOPMENT ON LOT 972X AT GUL ROAD |
|
|
|
|
|
MAIN CONTR: |
PTC CONST PTE LTD |
Contract Sum: |
$146,760.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-08 |
|
|
|
|
ARCHITECTS |
M-Team Consortium |
|
|
ENGINEERS |
M-Team Consortium |
|
|
OWNER: |
TA -SN ENTERPRISE PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 29
|
|
|
PROJECT: |
PROPOSED A & A EXISTING WORKS TO AN EXISTING SHIPYARD DEVELOPMENT INVOLVING ERCTION OF A 3-STOREY ANCILLARY OFFICE EXTENSION AND A SINGLE STOREY TOILET AT NO 5 BENOI ROAD |
|
|
|
|
|
MAIN CONTR: |
LIM SENG KOK CONTRACTOR |
Contract Sum: |
$74,360.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jan-08 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
|
|
|
OWNER: |
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A FACTORY 7-STOREY INDUSTRIAL DEVELOPMENT AT TAI SENG AVENUE |
|
|
|
|
|
MAIN CONTR: |
DEENN ENGINEERING PTE LTD |
Contract Sum: |
$459,213.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-08 |
|
|
|
|
ARCHITECTS |
LST ARCHITECTS |
|
|
ENGINEERS |
THAM & WONG |
|
|
OWNER: |
MR JOHN KO AH HUAT |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED NEW ERECTION OF PUBLIC HOUSING DEVELOPMENT COMPRISING 5 BLOCKS OF 20 STOREY RESIDENTIAL (TOTAL 633 UNITS), 1 BLK PRECINCT PAVILION AND EXTENSION OF EXISTING OF MULTI STOREY CAR PARK AT KANG CHING ROAD |
|
|
|
|
|
|
MAIN CONTR: |
PROGRESSIVE BUILDERS PTE LTD |
Contract Sum: |
$88,590.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-08 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
SURBANA CONSULTANTS PTE LTD |
|
|
OWNER: |
HDB |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF CONDOMINIUM HOUSING DEVELOPMENT COMPRISING OF 2 BLOCKS OF 6 STOREY RESIDENTIAL BUILDING (TOTAL 91 UNITS) WITH 1 BASEMENT CARPARK, SWIMMING POOL AND ANCILLARY FACILITIES LAND PARCEL C12 SENTOSA LAND |
|
|
|
|
|
|
|
MAIN CONTR: |
KIM SENG HENG ENGRG CONST (PTE) LTD |
Contract Sum: |
$1,724,618.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-08 |
|
|
|
|
ARCHITECTS |
RSP ARCHITECTS PLANNERS & ENGINEERS(P) LTD |
|
|
ENGINEERS |
ARUP SINGAPORE PTE LTD |
|
|
OWNER: |
HO BEE COVE PTE LTD |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED A & A TO EXISTING UNDERWATER WORKD SINGAPORE WITH AN ADDITION OF NEW DOLPHINE POOL & ANILLARY FACILITIES ON LOT 434 MK 34 AT 80 SILOSO ROAD, SENTOSA SINGAPORE 098969 FOR UNDERWATER WORLD SINGAPORE PTE LTD |
|
|
|
|
|
|
MAIN CONTR: |
KEN-PAL(S) PTE LTD |
Contract Sum: |
$341,798.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Aug-08 |
|
|
|
|
ARCHITECTS |
ATELIER UNIVESAL ARCHITECTS |
|
|
ENGINEERS |
MILLENNIUMS CONSULTANTS |
|
|
OWNER: |
UNDERWATER WORLD SINGAPORE PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 30
|
PROJECT: |
PROPOSED ERECTION OF A 4-STOREY FIRE STATION WITH A 7-STOREY TOWER ON LOT 2229P MK 34 AT BANYAN ROAD, JURONG ISLAND(WESTERN ISLAND PLANNING AREA) |
|
|
|
|
|
MAIN CONTR: |
LOGISTIC CONSTRUCTION PTE LTD |
Contract Sum: |
$514,353.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Feb-09 |
|
|
|
|
ARCHITECTS |
M/S KTB ARCHITECTS |
|
|
ENGINEERS |
E3 CONSULTING ENGINEERS |
|
|
OWNER: |
SINGAPORE CIVIL DEFENCE FORCE |
|
|
————– |
|
|
|
PROJECT: |
D2007-00331-010 CONSTRUCTION OF INFRASTRUCTURE AT 25 SUNGEI GEDONG RAOD-SITE A |
|
|
|
|
|
MAIN CONTR: |
PRELIM CONSTRUCTION PTE LTD |
Contract Sum: |
$304,872.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-09 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
|
|
|
OWNER: |
DSTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED 1 BLOCK OF SINGLE STOREY FACTORY AND ANCILLARY BUILDINGS ( TOILETS,SUB-STATION,CONSUMER SWITCH ROOM AND GUARD HOUSE) ON LOT 0349M PT MK 07 (PTE LOT A2510300) AT TUAS SOUTH STREET 5 |
|
|
|
|
|
|
MAIN CONTR: |
LBG-NGT CORPORATION PTE LTD |
Contract Sum: |
$91,137.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-09 |
|
|
|
|
ARCHITECTS |
ADDP ARCHITECTS |
|
|
ENGINEERS |
LONGROVE & ASSOCIATES |
|
|
OWNER: |
PUNJ LLOYD PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED REDEVELOPMENT TO EXISTING GENERAL INDUSTRIAL DEVELOPMENT AT 249 JALAN BOON LAY & 15 CHIN BEE DRIVE, SINGAPORE |
|
|
|
|
|
MAIN CONTR: |
EVAN LIM & CO.PTE.LTD. |
Contract Sum: |
$4,379,016.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-09 |
|
|
|
|
ARCHITECTS |
ARCHITECTS TEAM 3 |
|
|
ENGINEERS |
MEINHARDT (SINGAPORE) PTE LTD |
|
|
OWNER: |
SINGAPORE TECHNOLOGIES KINETICS LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF THE MARINA BAY SANDS INTEGRATED RESORT COMPRISING OF A 3-STOREY MUSEUM, A 5-STOREY PODIUM COMPLEX COMPRISING OF MICE,CASINO,THEATRE,RETAIL AND BASEMENT CARPARK,AND 3 BLOCKS OF 57-STOREY HOTEL DEVELOPMENT WITH SLY OARK IN 56TH STOREY AND 5 BASEMENT CARPARK ON LOT 256A TS 30 AT BAYFRONT AVENUE |
|
|
|
|
|
|
|
|
MAIN CONTR: |
HOA DA PTE LTD |
Contract Sum: |
$123,750.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-09 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
ARUP SINGAPORE PTE LTD |
|
|
OWNER: |
MARINA BAY SANDS PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ECTENSION TO THE EXISTING SINGLE-STOREY JTC D6 STANDARD FACTORY ON LOT 1255A(PLOT A22456) MK 7 AT 19 TUAS AVENUE 10 |
|
|
|
|
|
|
MAIN CONTR: |
ZHENGDA CORPORATION PTE LTD |
Contract Sum: |
$207,525.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Sep-09 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
TEAMWORK CONSULTANTS |
|
|
OWNER: |
KRUGER VENTILATION PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 31
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY DETACHED DWELLING HOUSE WITH BASEMENT,ATTIC AND SWIMMING POOL AT PLOT B14-01 TO B14-19 PEARL ISLAND,SOUTHERN SENTOSA COVE(SOUTHERN ISLANDS PLANNING AREA) |
|
|
|
|
|
|
MAIN CONTR: |
ZHENGDA CORPORATION PTE LTD |
Contract Sum: |
$969,951.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Dec-09 |
|
|
|
|
ARCHITECTS |
ECO.ID ARCHITECTS |
|
|
ENGINEERS |
GLT ENGINEERS PTE |
|
|
OWNER: |
XIMENG LAND(S) PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 1 NEW BLOCK,ADDITIONS & ALTERATIONS TO PART EXTG SINGLE-USER GENERAL INDUSTRIAL DEVELOPMENT ON LOT 2494W(PLOT A16828) MK06 AT 15 CHIN BEE DRIVE BLOCK 9 |
|
|
|
|
|
|
MAIN CONTR: |
|
Contract Sum: |
$364,349.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-10 |
|
|
|
|
ARCHITECTS |
ARCHITECTS TEAM 3 |
|
|
ENGINEERS |
MEINHARDT(SINGAPORE) PTE LTD |
|
|
OWNER: |
S’PORE TECHNOLOGIES KINETICS LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED EXTENSION, A & A TO EXISTINF SINGLE-STOREY FACTORY WITH 2-STOREY ANCILLARY FACTORY WITH 2-STOREY ANCILLARY OFFICE INVOLVING EXTENSION OF SINGLE-STOREY FACTORY TO 2-STOREY AT 24 BANOI PLACE |
|
|
|
|
|
|
MAIN CONTR: |
FL WONG CONST PTE LTD |
Contract Sum: |
$112,502.95 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jun-10 |
|
|
|
|
ARCHITECTS |
L & L CONSULTANTS |
|
|
ENGINEERS |
THK CONSULTANT ENGINEERS |
|
|
OWNER: |
|
|
|
————– |
|
|
|
PROJECT: |
C916 DESIGN AND CONSTRUCTION OF BEAUTY WORLD AND TUNNELS FOR DOWNTOWN LINE STAGE 2 |
|
|
|
|
|
|
MAIN CONTR: |
MCCONNELL DOWELL SEA PTE LTD |
Contract Sum: |
$196,135.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Aug-10 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
|
|
|
OWNER: |
LTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITION OF OPEN CONCRETE SLIPWAY & OPEN SERVICE YARD TO EXISTING PART SINGLE/PART 2-STOREY SINGLE USER INDUSTRIAL FACTORY WITH 2-STOREY ANCILLARY OFFICE AT 12A JALAN SAMULAN |
|
|
|
|
|
|
MAIN CONTR: |
KENSTON CONSTURCTION PTE LTD |
Contract Sum: |
$158,132.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-10 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
PROTEAM CONSULTING ENGINEERS |
|
|
OWNER: |
Mr Ng Seek Long |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 32
|
PROJECT: |
CONSTRUCTION OF SINGLE STOREY AMNISTRATIVE/OPERATIONAL BUILDING CUM ENGINEERING WORKSHOP,GATEWAY & 2-STOREY SUBSTATION ON JURONG ISLAND |
|
|
|
|
|
MAIN CONTR: |
ANDERCO PTE LTD |
Contract Sum: |
$148,152.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
Aug-10 |
|
|
|
|
ARCHITECTS |
PSA |
|
|
ENGINEERS |
PSA |
|
|
OWNER: |
PSA |
|
|
————– |
|
|
|
PROJECT: |
PROJECT D2008-00257-020-DEVELOPMENT OF INFRASTRUCTURE AND FACILITIES AT SELETAR CAMP |
|
|
|
|
|
|
MAIN CONTR: |
KIENTA ENGINEERING CONSTRUCTION PTE LTD |
Contract Sum: |
$966,404.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Feb-11 |
|
|
|
|
ARCHITECTS |
HCF & ASSOCIATES |
|
|
ENGINEERS |
P & T CONSULTANTS PTE LTD |
|
|
OWNER: |
DSTA |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF PART SINGLE PART 2-STOREY BUILDING FOR ADMIN OFFICE AND WORKSHOP ON LOT 03036(PT),03038K(PT) AND 04377M(PT) MK 20 AT PICCADILLY SELETAR |
|
|
|
|
|
|
MAIN CONTR: |
YEW ANN CONSTURCTION PTE LTD |
Contract Sum: |
$116,680.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-11 |
|
|
|
|
ARCHITECTS |
URBAN 3 ARCHITECTS |
|
|
ENGINEERS |
MTECH CONSULTANTS |
|
|
OWNER: |
DSTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED NEW ERECTION OF A 9 STOREYS MULTIPLE-USER CLEAN AND LIGHT INDUSTRIAL DEVELOPMENT COMPRISING 206 FLATTED FACTORY UNITS WITH A STAFF CANTEEN AND 12 UNITS SHOWROOMS AT YISHUN AVE 6 & STREET 23 |
|
|
|
|
|
|
MAIN CONTR: |
OKH HOLDINGS PTE LTD |
Contract Sum: |
$1,607,144.90 |
TYPE OF JOB: |
R C Piling |
Completion: |
Mar-11 |
|
|
|
|
ARCHITECTS |
BEN DESIGN ARCHITECTS |
|
|
ENGINEERS |
S C CHEE CONSULTING ENGINEERS |
|
|
OWNER: |
MR BOON WEEN FONG |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTON OF 5-STOREY WITH ATTIC CONDOMUNIUM DEVELOPMENT (TOTAL 104 UNITS) WITH PROVISION OF CARPARK AT 1ST STY,SWIMMING POOL,SUBSTATION,BIN CENTRE & COMMUNAL FACILITIES ON LOTS 1874A & 6170W MK26 AT LORONG N TELOK KURAU-THE SOUND |
|
|
|
|
|
|
|
MAIN CONTR: |
ENVIRON CONST CO (PTE)LTD |
Contract Sum: |
$167,549.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-11 |
|
|
|
|
ARCHITECTS |
ADDP ARCITECTS |
|
|
ENGINEERS |
KTP CONSULTANTS PTE LTD |
|
|
OWNER: |
BAYSHORE GREEN PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 33
|
PROJECT: |
PROPOSED NEW ERECTION OF A PART SINGLE,PART 4-STY SINGLE USER INDUSTRIAL DEBELOPMENT AT NO.5 SIXTH LOK YANG ROAD ON LOT (S) 01131M MK06 AT 5 SIXTH LOK YANG ROAD |
|
|
|
|
|
|
MAIN CONTR: |
LC & T BUILDERS (1971) PTE LTD |
Contract Sum: |
$140,670.20 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-11 |
|
|
|
|
ARCHITECTS |
A+PROJECTS CONSULTANTS |
|
|
ENGINEERS |
K P CHAI ENGRG & MANAGEMENT CONSULTANTS |
|
|
OWNER: |
BRC ASIA LIMITED |
|
|
|
|
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 4 STOREY PREFABRICATION TEMPORARY DORMITORY BUILDINGS MK 6 AT JURONG ROAD |
|
|
|
|
|
MAIN CONTR: |
ANDERCO PTE LTD |
Contract Sum: |
$151,217.25 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-11 |
|
|
|
|
ARCHITECTS |
OMNI ARCHITECT |
|
|
ENGINEERS |
LONGROVE & ASSOCIATES PTE LTD |
|
|
OWNER: |
MULTIGROUP ENTERPRISE PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED PUBLIC HOUSING DEVELOPMENT COMPRISING 6 BLOCKS OF 16-STOREY RESIDENTIAL BUILDING(TOTAL 503 UNITS) AND 1 BLOCK OF MULTI-STOREY CARPARK WITH ROOF GARDEN,ESS & PRECINCT PAVILION AT PUNGGOL WEST CONTRACT 17 |
|
|
|
|
|
|
MAIN CONTR: |
NANJING DADI CONST(GROUP)CO.LTD |
Contract Sum: |
$122,954.60 |
TYPE OF JOB: |
R C Piling |
Completion: |
Apr-11 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
SURBANA |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY HANGER ON LOT 4521X PT & 4543V PT (ALLOCATION PLAN NO 1758000) MK 20 AT SELETAR AEROSPACE VIEW IN SELETAR AEROSPACE PARK |
|
|
|
|
|
|
MAIN CONTR: |
CCM INDUSTRIAL PTE LTD |
Contract Sum: |
$515,856.38 |
TYPE OF JOB: |
R C Piling |
Completion: |
May-11 |
|
|
|
|
ARCHITECTS |
CHUNG ARCHITECTS PTE LTD |
|
|
ENGINEERS |
TEAMWORK CONSULTANTS |
|
|
OWNER: |
MAJAVIATION PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF AN ADDITIONAL BLOCK OF 4-STOREY SINGLE-USER FACTORY WITH ANCILLARY WORKERS’ DORMITORY ON LOT 3461L & 3623C MK07 AT 3 TUAS VIEW CIRCUIT |
|
|
|
|
|
|
MAIN CONTR: |
GREATH TEAM PTE LTD |
Contract Sum: |
$381,888.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-11 |
|
|
|
|
ARCHITECTS |
ADDP ARCHITECTS |
|
|
ENGINEERS |
KP CHAI ENGRG & MANAGEMENT CONSULTANTS |
|
|
OWNER: |
ANDERCO PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 34
|
PROJECT: |
PROPOSED 4-STOREY 66KV ELECTRICAL SUBSTATION ON LOTS B277A-PT & 8278K-PT MK05 AT TOH GUAN ROAD |
|
|
|
|
|
|
MAIN CONTR: |
YONG XING CONSTUCTION PTE LTD |
Contract Sum: |
$152,165.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-11 |
|
|
|
|
ARCHITECTS |
CHUNG ARCHITECTS PTE LTD |
|
|
ENGINEERS |
MTECH CONSULTANTS |
|
|
OWNER: |
URA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 12-STOREY STUDENTS HOSTEL ON LOT 06770-P AT POTONG PASIR AVE 1 |
|
|
|
|
|
|
MAIN CONTR: |
KIAN HIAP CONT PTE LTD |
Contract Sum: |
$133,440.00 |
TYPE OF JOB: |
R C Piling |
Completion: |
Jul-11 |
|
|
|
|
ARCHITECTS |
ARCHITECTS TEAM 3 PTE LTD |
|
|
ENGINEERS |
DE CONSULTANTS)S) PTE LTD |
|
|
OWNER: |
MINISTRY OF EDUCATION |
|
|
|
|
|
|
MAIN CONTR: |
G PROJECTS PTE LTD |
Contract Sum: |
$275,395.08 |
TYPE OF JOB: |
RC Piling |
Completion: |
Nov-11 |
|
|
|
|
ARCHITECTS |
YJC ARCHITECTS |
|
|
ENGINEERS |
YR 2000 ENGINEERS CONSULTANT |
|
|
OWNER: |
OILFIELD SERVICES & SUPPLIES PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED TEMBUSU MULTI-ULTITIES COMPLEX INVOLING NEW ERECTIONS OF STORE/ WORKSHOP BUILDING, CHEMICAL / OIL STORE BUILDING AND ANCILLARY WORKS ON LOT 02814K MK 34 AT 20 TEMBUSU CRESCENT |
|
|
|
|
|
|
MAIN CONTR: |
BSI (1990) PTE LTD |
Contract Sum: |
$486,601.40 |
TYPE OF JOB: |
RC Piling |
Completion: |
Jan-12 |
|
|
|
|
ARCHITECTS |
WORLEY PARSONS |
|
|
ENGINEERS |
TEAMWORK CONSULTANTS |
|
|
OWNER: |
TUAS POWER |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A BLOCK OF 5-STOREY MULTI-USER WAREHOUSE BUILDING COMPRISING 5-LEVELS OF FLATTED WAREHOUSE AND ANCILLARY STAFF CANTEEN ON LOT 08616A MK 05 AT OLD TOH TUCK ROAD |
|
|
|
|
|
|
MAIN CONTR: |
PAGE PTE LTD |
Contract Sum: |
$1,929,283.00 |
TYPE OF JOB: |
RC Piling |
Completion: |
Aug-12 |
|
|
|
|
ARCHITECTS |
ID ARCHITECTS PTE LTD |
|
|
ENGINEERS |
ENGINEERS PARTNERSHIP LLP |
|
|
OWNER: |
INCORPORATED BUILDERS PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 35
|
PROJECT: |
PROPOSED PUBLIC HOUSING DEVELOPMENT COMPRISING OF 14 BLOCKS OF 15-STOREY RESIDENTIAL BUILDING AND 2 BLOCKS OF MULTI-STOREY CARPARK WITH COMMUNITY FACILITIES & PRECINCT PAVILION AT YISHUN AVE 6 / YISHUN ST 31 |
|
|
|
|
|
|
MAIN CONTR: |
TEAMBUILD CONSTRUCTION PTE LTD |
Contract Sum: |
$207,199.00 |
TYPE OF JOB: |
RC Piling |
Completion: |
Apr-12 |
|
|
|
|
ARCHITECTS |
ADDP ARCHITECTS |
|
|
ENGINEERS |
DE CONSULTANTS (S) PTE LTD |
|
|
OWNER: |
HDB |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITIONALS AND ALTERATIONS TO EXISTING ST.JOSEPH’S INSTITUTION JUNIOR SCHOOL INVOLVING ERECTION OF 3-STOREY ANCILLARY BLOCK ON LOT 02049A & 02356M PT AT NO 3 ESSEX ROAD |
|
|
|
|
|
|
MAIN CONTR: |
CRYSTAL JADE ENGINEERING PTE LTD |
Contract Sum: |
$708,583.64 |
TYPE OF JOB: |
BORED PILING WORKS |
Completion: |
Jun-12 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
|
|
|
OWNER: |
MINISTRY OF EDUCATION |
|
|
————– |
|
|
|
PROJECT: |
D2009-00103 CONSTRUCTION OF MULTISTOREY VEHICLE STOGAGE AND SUPPORTING FACILITIES AT TRANSIT ROAD |
|
|
|
|
|
|
MAIN CONTR: |
LIAN BENG CONSTURCTION(1988)PTE LTD |
Contract Sum: |
$2,906,100.00 |
TYPE OF JOB: |
RC Piling |
Completion: |
Oct-12 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
THAM & WONG LLP |
|
|
OWNER: |
DSTA |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED EXECUTIVE CONDOMINIUM HOUSING DEVELOPMENT COMPRISING OF 9 BLOCKS OF 18-STOREY APARTMENT AND 1 BLOCK OF 4 STOREY MULTI-STOREY CARPARKS WITH COMMUNAL FACILITIES AT BUANGKOK DRIVE/COMPRASSVALE BOW |
|
|
|
|
|
|
MAIN CONTR: |
LUM CHANG BLDG CONTRACTORS P/L |
Contract Sum: |
$295,645.61 |
TYPE OF JOB: |
RC Piling |
Completion: |
Apr-13 |
|
|
|
|
ARCHITECTS |
ADDP ARCJITECTS |
|
|
ENGINEERS |
DE CONSULTANTS(S)PTE LTD |
|
|
OWNER: |
FCL COMPASSVALE PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF MULTIPLE-USER GENERAL INDUSTRIAL DEVELOPMEN COMPRISING 10 UNITS OF 3-STOREY TERRACE FACTORY ON LOT 04298X MK 07 AT TUAS VIEW SQUARE |
|
|
|
|
|
|
MAIN CONTR: |
SCB TUAS PTE LTD |
Contract Sum: |
$342,685.60 |
TYPE OF JOB: |
RC Piling |
Completion: |
Mar-13 |
|
|
|
|
ARCHITECTS |
3HPARCHITECTS PTE LTD |
|
|
ENGINEERS |
KCL CONSULTANTS PTE LTD |
|
|
OWNER: |
SANCHOON BUILDERS PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 36
|
PROJECT: |
PROPOSED NEW ERECTION OF A 8 STOREY MULTI-USER CLEAN AND LIGHT INDUSTRY DEVELOPMENT COMPRISING 287 RAMP-UP FACTORY UNITS WITH A TEMPORARY ANCILLARY STAFF CANTEEN ON LOT 05911L MK 13 AT WOODLANDS CLOSE,WOODLANDS DRIVE 64, AND WOODLANDS AVENUE 12 SINGAPORE |
|
|
|
|
|
|
|
MAIN CONTR: |
OKH HOLDINGS PTE LTD |
Contract Sum: |
$3,143,647.50 |
TYPE OF JOB: |
RC Piling |
Completion: |
Apr-13 |
|
|
|
|
ARCHITECTS |
BDL GROUP ARCHITECTS |
|
|
ENGINEERS |
CGM ENGINEERING CONSULTANTS |
|
|
OWNER: |
OKH DEVELOPMENT PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 10-STOREY APARTMENT (18 UNITS) WITH MECHANISED PARKING AT BASEMENT,SWIMMING POOL AND COMMUNAL FACILITIES AT 10TH STOREY ON LOTS 01463C & 99487W TS 21 AT 13 & 15 INSTITUTION HILL (RIVER VALLEY PLANNING AREA) |
|
|
|
|
|
|
|
MAIN CONTR: |
TLY CONSTURCTION PTE LTD |
Contract Sum: |
$323,527.00 |
TYPE OF JOB: |
BORED PILING WORKS |
Completion: |
Apr-13 |
|
|
|
|
ARCHITECTS |
RONNY CHIN ARCHITECTS |
|
|
ENGINEERS |
GLT ENGINEERS PRIVATE |
|
|
OWNER: |
OPTIMUS HILL PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED NEW DEVELOPMENT COMPRISING OF 3-STOREY ENGINEERING BUILDING,A SINGLE STOREY CANTEEN AND EQUIPMENT AHED WITH AOPEN SPACE CARPAROS ON LOT 04566X MK 20 AT 600 WEST CAMP ROAD,SELETAR AIRPORT,SINGAPORE |
|
|
|
|
|
|
MAIN CONTR: |
UNION CONTRACTORS(S) PTE LTD |
Contract Sum: |
$348,600.00 |
TYPE OF JOB: |
R C PILING WORKS |
Completion: |
Feb-13 |
|
|
|
|
ARCHITECTS |
MODE ARCHITECTS PTE LTD |
|
|
ENGINEERS |
T H CHUAH & PARTNERS LLP |
|
|
OWNER: |
ST AEROSPACE |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED 5 BLOCKS OF 11/12/14-STOREY WORKERS DORMITORY AT KAKI BUKIT RAOD 3 |
|
|
|
|
|
MAIN CONTR: |
CHANG HUA CONSTURCTION PTE LTD |
Contract Sum: |
$1,174,968.00 |
TYPE OF JOB: |
R C PILING WORKS |
Completion: |
Jun-13 |
|
|
|
|
ARCHITECTS |
SURBANA INTERNATIONAL CONSULTANTS PL |
|
|
ENGINEERS |
SURBANA INTERNATIONAL CONSULTANTS PL |
|
|
OWNER: |
KAKI BUKIT DEVELOPMENTS PTE LTD |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 37
|
PROJECT: |
PROPOSED NEW ERECTION OF A SINGLE STOREY TRANSMISSION CENTRE ON LOT 03215V MK 10 AT NO 21 LORONG SESUAI |
|
|
|
|
|
MAIN CONTR: |
SIMPEX CONSTRUCTION PTE LTD |
Contract Sum: |
$151,270.00 |
TYPE OF JOB: |
RC Piling |
Completion: |
Apr-13 |
|
|
|
|
ARCHITECTS |
DP ARCHITECTS PTE LTD |
|
|
ENGINEERS |
WEB STURCTURES |
|
|
OWNER: |
MEDIACORP PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF A 2-STOREY BUILDING EXTENSION AND ADDITION AND ALTERATION TO EXISTING POTONG PASIR COMMUNITY CLUB ON LOT 05368N MK 17 AT 6 POTONG PASIR AVENUE 2 |
|
|
|
|
|
|
MAIN CONTR: |
APEX PROJECTS PTE LTD |
Contract Sum: |
$278,573.00 |
TYPE OF JOB: |
RC PILING WORKS |
Completion: |
Jul-13 |
|
|
|
|
ARCHITECTS |
ATA ARCHITECTS PTE LTD |
|
|
ENGINEERS |
KKT CONSULTANTS |
|
|
OWNER: |
PEOPLE’S ASSOCIATION |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ADDITIONS AND ALTELRATIONS TO EXISTING BUKIT PANJANG PRIMARY SCHOOL AND GREENRIDGE PRIMARY SCHOOL |
|
|
|
|
|
MAIN CONTR: |
QBH PTE LTD |
Contract Sum: |
$1,450,000.00 |
TYPE OF JOB: |
BORED PILING WORKS |
Completion: |
Aug-13 |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
MOTT MACDONALD SINGAPORE PTE LTD |
|
|
OWNER: |
MINISTRY OF EDUCATION |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 3 STOREY SINGLE USER GENERAL INDUSTRIAL FACTORY WITH TEMPORARY ANCILLARY WORKERS’ DORMITORY(FOR 30 WORKERS) AND TEMPORARY ANCILLARY STAFF CANTEEN ON LOT 04651A MK 07 AT TUAS SOUTH AVENUE 14/TUAS SOUTH STREET 13 |
|
|
|
|
|
|
|
MAIN CONTR: |
|
Contract Sum: |
$418,756.00 |
TYPE OF JOB: |
R C PILING WORKS |
Completion: |
Apr-13 |
|
|
|
|
ARCHITECTS |
KJ GROUP CONSULT |
|
|
ENGINEERS |
CE CONSULTING ENGINEERS |
|
|
OWNER: |
KOH GROUP PTE LTD |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF 2 STOREY FACTORY WITH MEZZANINE OFFICE AND TEMPORARY ANCILLARY WORKER’S DORMITORY(FOR 38 WORKERS) ON LOT 0496A MK 11 AT 38 SUNGEI KADUT STREET 2 |
|
|
|
|
|
|
MAIN CONTR: |
TAT HIN BUILDERS PTE LTD |
Contract Sum: |
$656,049.00 |
TYPE OF JOB: |
R C PILING WORKS |
Completion: |
CURRENT |
|
|
|
|
ARCHITECTS |
|
|
|
ENGINEERS |
FONG CONSULT PTE LTD |
|
|
OWNER: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LIM SING PILING PTE LTD TRACK RECORD 38
|
PROJECT: |
PROPOSED ERECTION OF 2-STOREY FACTORY WITH ROOF GARDEN FOR DNV MTSIT LABORATORY AT 158A GUL CIRCLE |
|
|
|
|
|
MAIN CONTR: |
CHANG HUA CONSTRUCTION PTE LTD |
Contract Sum: |
$311,352.00 |
TYPE OF JOB: |
RC Piling |
Completion: |
Aug-13 |
|
|
|
|
ARCHITECTS |
ARCHITECTS 23.5 DEGREE |
|
|
ENGINEERS |
KCL CONSULTANTS PTE LTD |
|
|
OWNER: |
DNV MTSIT LABORATORY |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED A & A TO EXISTING SINGLE USER FACTORY INVOLVE A & A TO EXISTING BUILDING AND ERECTION OF A NEW 5-STOREY BLOCK WITH SECONDARY DORMITORY (FOR 386 WORKERS) ON LOT 0102V,01392T MK 06 AT 21 & 23 KIAN TECK ROAD(JURONG WEST PLANNING AREA) |
|
|
|
|
|
|
|
MAIN CONTR: |
SOILBUILD CONSTRUCTION GROUP LTD |
Contract Sum: |
$417,800.00 |
TYPE OF JOB: |
RC PILING WORKS |
Completion: |
CURRENT |
|
|
|
|
ARCHITECTS |
CAIDE ARCHITECTS |
|
|
ENGINEERS |
ZPT ENGINEERING SERVICES |
|
|
OWNER: |
VIKING FACILITIES MANAGEMENT & OPERATIONS PTE LTD |
|
————– |
|
|
|
PROJECT: |
PROPOSED ERECTION OF PART SINGLE STOREY/PART 2-STOREY SINGLE USER INDUSTRIAL BUILDING ON LOT 03934L MK 07 AT TUAS SOUTH AVENUE 2 & 5 (TUAS PLANNING AREA) |
|
|
|
|
|
|
MAIN CONTR: |
WANG FUNG CONSTRUCTION PTE LTD |
Contract Sum: |
$444,254.00 |
TYPE OF JOB: |
RC PILING WORKS |
Completion: |
CURRENT |
|
|
|
|
ARCHITECTS |
MODE ARCHITECTS PTE LTD |
|
|
ENGINEERS |
T.H.CHUAH & PARTNERS LLP |
|
|
OWNER: |
KX TECHNOLOGIES |
|
|
————– |
|
|
|
PROJECT: |
PROPOSED R C PILING WORKS FOR TEMASEK CLUB AT RIFLE RANGE ROAD(DSTA PROJECT) |
|
|
|
|
|
|
MAIN CONTR: |
KIENTA ENGINEERIG CONST PTE LTD |
Contract Sum: |
$841,070.00 |
TYPE OF JOB: |
R C PILING WORKS |
Completion: |
CURRENT |
|
|
|
|
ARCHITECTS |
DSTA |
|
|
ENGINEERS |
DSTA |
|
|
OWNER: |
DSTA |
|
|
|
|
|
|